Comtec Solar warns of full-year 2016 loss on manufacturing asset write-downs

January 12, 2017
Facebook
Twitter
LinkedIn
Reddit
Email
Comtec did not provide financial figures related to the expected losses, noting that only a preliminary assessment had been made by the company. Image: Comtec

Monocrystalline wafer producer Comtec Solar Systems Group has said in financial filings that it would report a substantial net loss for the year, due to expected write-down of the assets related to its manufacturing facilities in Malaysia and China. 

Comtec did not provide financial figures related to the expected losses, noting that only a preliminary assessment had been made by the company.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

However, Comtec said that the asset write-down for its Malaysian facilities was due to the recently announced sale of the facilities to leading integrated monocrystalline ingot to module producer, LONGi Silicon Materials. Comtec sold the facilities to LONGi below the net book value, although is retaining certain production tools for future sale or use at its existing wafer facilities in China.

The company also noted that a write-down in wafer manufacturing assets in China would also be made, as well as in inventory, due to the weak demand for its monocrystalline wafers after several customers announced mono c-Si solar cell facility closures and the scaling back of production in the later part of 2016.

13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our third PV CellTech conference dedicated to the U.S. manufacturing sector. The events in 2023, 2024 and 2025 were a sell out success and 2026 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.

Read Next

March 30, 2026
The scope of supply chain diligence for PV projects in the US seeking tax credits has expanded, requiring greater vigilance in procurement, writes Intertek CEA's Paul Wormser.
March 27, 2026
The US International Trade Commission (ITC) has begun an investigation into tunnel oxide passivated contact (TOPCon) solar products in the US, following a complaint by US thin-film module manufacturer First Solar.
March 27, 2026
Two module production facilities in China have been awarded the first Supply Traceability Standard certifications by Europe’s Solar Stewardship Initiative (SSI).
March 26, 2026
More than 70% of global solar manufacturing facilities exhibited “major” or “critical” defects in 2025, according to a new report from Intertek CEA.
March 25, 2026
The global annual capital expenditure on PV manufacturing equipment is expected to more than double to US$43.8 billion over the next decade, according to a report from VDMA.
March 25, 2026
Drawing on multiple field inspections, James Whittmore of Enertis Applus+ discusses some of the common problems emerging in the run-up to the US’s July project safe harbour deadline.

Upcoming Events

Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland