Enel pens deal for US solar-powered green hydrogen project

Facebook
Twitter
LinkedIn
Reddit
Email
Enel Green Power’s 150MW Aurora distributed solar plant in Minnesota. Image: Enel Green Power.

Enel Green Power has signed an agreement that will see energy from one of its US solar projects converted into green hydrogen to be supplied to a bio-refinery.

The company has penned a memorandum of understanding (MoU) with Maire Tecnimont subsidiary NextChem, which will be the engineering, procurement and construction (EPC) contractor for the facility, which is slated to be operational in 2023.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

With a goal of growing its green hydrogen capacity to over 2GW by 2030, Enel said it is looking at the potential to co-locate electrolysers across its US development pipeline to help create integrated plants that can leverage on more sources of revenue. While it is unclear which solar installation is to be used for the new project, the company said it is focused on states where it has an existing operational presence, such as Texas, Utah and North Dakota.

Salvatore Bernabei, CEO of Enel Green Power, said the company is “actively scouting for opportunities” for developing green hydrogen projects both in Europe and the Americas. “We look forward to joining forces with partners such as Maire Tecnimont to make the most of the significant potential that green hydrogen represents for the decarbonisation of hard-to-abate sectors,” he added.

Having recently completed the 245MW second phase of Texas’s largest PV project, the Roadrunner solar plant, Enel Green Power’s operational green energy portfolio in North America consists of around 70 facilities with a total capacity of more than 6GW.

The firm’s green hydrogen push comes the same week as seven companies – ACWA Power, Iberdrola, CWP Renewables, Envision, Ørsted, Snam and Yara – announced the establishment of a new initiative that aims to scale up the production of green hydrogen 50-fold in the next six years.

Requiring an investment of around US$110 billion, the so-called Green Hydrogen Catapult will target the deployment of 25GW of renewables-based hydrogen production by 2026, with a goal of driving down the cost of producing the fuel to below US$2/kg.

Read Next

October 23, 2026
New Jersey representative Rob Menendez has introduced the Socket Full of Sunshine Act, the first federal-level bill to support plug-in solar.
October 23, 2026
Deriva Energy has announced the close of approximately US$540 million in financing for its 350MW Sullivan County Power Project.
October 22, 2026
NextEra Energy recorded a 9.7% increase in its net earnings in Q3 2026, with earnings up 9.5% in the nine months to date this year.
October 22, 2026
Kendall Sustainable Infrastructure (KSI) has started operating three community solar projects totalling 15.8MWdc across New York and Oregon.
October 21, 2026
Solar power generation facilities can be exposed to risks from the effects of hailstorms, snow and typhoons, according to kWh Analytics.
October 21, 2026
Pivot Energy has closed a US$500 million bilateral corporate credit facility to further solar PV and BESS deployments.

Upcoming Events

Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye