India outlines 20% customs duty on solar modules, cells and inverters from August 2020

Facebook
Twitter
LinkedIn
Reddit
Email
Image: Flickr/Sanyam Bahga.

India is set to impose a 20% levy on imported solar modules, cells and inverters from August, replacing the current safeguard duty.

Numerous local reports state the levy was proposed by Indian power minister RK Singh yesterday during a call with industry representatives, confirming that Prime Minister Narendra Modi’s government intended to impose a Basic Custom Duty (BCD) of 20% on imports.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

That BCD, which comes as part of the ‘Make in India’ initiative designed at stimulating domestic manufacturing, would replace the existing safeguard duty of 15% set to expire on 29 July 2020.

The update serves as confirmation of duties first teased within the Union budget earlier this year, which at the time set no particular timeframe for the introduction of such levies. It would also seem to remove any confusion over potential exemptions for components or equipment, as were suggested a month later.  

It also comes amidst a push from India’s Ministry of New and Renewable Energy to rekindle domestic renewable manufacturing having witnessed imports struggle with logistics issues posed by the ongoing COVID-19 pandemic. In May the government said that it had designated solar PV manufacturing, as well as advanced battery manufacture as 'Champion Sectors' of national self-reliance and would be supporting both with incentives.

In addition, RK Singh also confirmed that an approved list of PV manufacturers for use in government-backed solar projects would be published in October this year, having been pushed back from the original date of April following the onset of the pandemic.

While expected, the news will come as blow to Chinese inverter manufacturers which have come to dominate India’s rooftop solar inverter market, as research compiled by JMK Research & Analytics showed earlier this year.

Read Next

July 11, 2025
Indian independent power producer (IPP) Juniper Green Energy has commissioned an additional 71MWp at Chapalgaon Solar Project in Solapur, Maharashtra.
July 10, 2025
UbiQD has signed a supply agreement with First Solar to supply its fluorescent quantum dot technology for use in the latter’s PV panels.
July 9, 2025
Caelux has finished the first sale of its perovskite glass, which will be paired with a silicon module developed by a 'reputable manufacturer'.
July 9, 2025
Indian solar water pump and motor manufacturer Shakti Pumps has successfully raised INR2.9 billion (US$34.1 million) to build a solar cell and module manufacturing plant.
July 8, 2025
German solar glass manufacturer Glasmanufaktur Brandenburg (GMB) has filed for insolvency after posting monthly losses of €900,000 this year.
July 8, 2025
Energy consultancy JMK Research has forecast 28.3GW of utility-scale and residential solar PV to be installed in India during fiscal year 2026.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 22, 2025
Bilbao, Spain
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK