Indian tea plantation goes 100% solar with 3MW open access project

Facebook
Twitter
LinkedIn
Reddit
Email
The solar park was built near the city of Madurai for The Peria Karamalai Tea & Produce Co. Credit: IBC Solar

German solar and storage firm IBC Solar has completed a 3MW open access solar project for a tea producer in the Indian state of Tamil Nadu.

Indian company LNB Renewable Energy was in charge of the entire project development, the approvals and the connection to the grid, while IBC Solar was responsible for the EPC, including the turnkey construction.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

IBC has previously focused on northern India and this – its seventh large-scale project in the region – is its first in the south. In a release, the firm said that instead of having to get used to immense heat and sandy soils, the installation team had to deal with an extended Monsoon season.

The solar park was built near the city of Madurai for The Peria Karamalai Tea & Produce. The NSE listed company is part of LN Bangur Group, which has already collaborated with IBC Solar previously on numerous major solar projects.

Shreeyash Bangur, managing Director of LN Bangur Group, stated: “This project is of paramount importance to us, as we have replaced our 20-year-old wind power plant. Our tea will now be produced with 100% solar power.”

The project is part of India’s open access policy, which offers private investors an incentive to invest in the power generation sector. The Electricity Act of 2003 stipulates that any company or individual who has built a power generation plant has the right of free access to the power lines in order to transport the electricity from the plant to the point of use.

Read Next

May 6, 2025
The global solar market will continue to slow in 2025 after 2024 saw the total capacity growth rate decrease by over 50%, according to a report from SolarPower Europe (SPE).
May 6, 2025
While other technologies exist, c-Si solar PV technology is the leading candidate for large-scale energy production, writes Radovan Kopecek.
April 29, 2025
Reassessing the role distributed solar operators have to play in minimising cybersecurity risks is key to Europe's solar cybersecurity.
April 24, 2025
Tata Power Renewable Energy has signed a power purchase agreement (PPA) with Tata Motors to build a 131MW wind-solar hybrid energy project.
April 16, 2025
Chinese, Indian and American companies have strengthened their positions atop the solar industry’s EPC rankings, according to Wiki-Solar.
April 15, 2025
Renewable energy will need policy support to reach “economically optimal” levels for the global energy transition, according to BloomberNEF.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia