Silicon Ranch completes Tennessee’s largest PV installation, a 53MW solar farm

April 24, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
Silicon Ranch employed over 300 people during the construction phase of the project, which has a generation capacity of 53MW. Image: Silicon Ranch

The largest PV project in the state of Tennessee is now operational at Naval Support Activity (NSA) Mid-South in Millington. The installation was brought online thanks to a partnership between Silicon Ranch, the City of Millington, the US Navy, Memphis, Light, Gas and Water (MLGW) and the Tennessee Valley Authority (TVA).

Silicon Ranch employed over 300 people during the construction phase of the project, which has a generation capacity of 53MW. It will provide renewable energy to the NSA Mid-South and TVA as part of a contract signed over the next 20 years. Silicon Ranch also signed a long-term lease with the US Navy for 29 hectares of base land and purchased an adjacent 140 hectares from the Millington Industrial Development Board (MIDB).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Even though most of the project is located on this adjacent private land, the naval project will provide energy by way of an alternative electrical feed that will increase energy security and resilience at NSA Mid-South.

NSA Mid-South Commanding Officer Capt. Alonza “Al” Ross said: “This solar project represents progress toward our goal of becoming the Navy's premier installation through maintaining excellence in our facilities and services. It enhances our ability to manage our most important asset—our people—and helps us perform the critical function of supporting warfighter capabilities and readiness.”

Silicon Ranch co-founder and CEO Matt Kisber added: “This innovative energy project is the result of a truly collaborative effort, and Silicon Ranch thanks our partners at the US Navy, TVA, MLGW, and the MIDB for making this investment possible. We are especially honored to commission the largest solar facility in our home state of Tennessee and to support the mission of both NSA Mid-South and TVA.”

Read Next

January 16, 2026
Global tech giant Amazon has been approved as the buyer of the 1.2GW Sunstone solar project in Oregon, one of the largest solar PV projects in the US.
January 16, 2026
US C&I solar developer Altus Power has acquired four solar projects with a total capacity of 105MW from IPP Cordelio Power. 
January 16, 2026
The Patent Trial and Appeal Board (PTAB) of the US Patent and Trademark Office (USPTO) has partially ruled against solar manufacturer Maxeon in several claims against Canadian Solar.
January 16, 2026
Independent power producer (IPP) Origis Energy has signed a 303MW power purchase agreement with tech giant Meta for the Greyhound A Solar PV project in Texas.
January 15, 2026
Enphase has begun US shipments of its new IQ9N-3P three-phase gallium nitride-based microinverter aimed at commercial rooftops.
January 15, 2026
Independent power producer (IPP) Origis Energy has completed the second phase of a 300MW solar PV project in Florida, US.

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
November 3, 2026
Málaga, Spain