NTPC tenders 225MW of solar under DCR in Uttar Pradesh

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: NTPC

India’s largest utility NTPC has tendered 225MW of solar using local content rules at Billhaur in the state of Uttar Pradesh.

The tender comes under the Domestic Content Requirement  (DCR) category, which mandates equipment to be sourced locally.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The tender is for design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading, storage, installation and commissioning of the 225MW in a single block on  turnkey basis. O&M must be provided for 15 years.

In related news, Solar Energy Corporation of India has also issued a tender for EPC services on 5MW of solar also under DCR rules at Bharat Dynamics Limited, Ibrahimpatnam, in the state of Telangana. This includes five years of O&M services.

The DCR was a major support mechanism from the Indian government for its local manufacturers, but it was contested by the US at the WTO and is due to be srapped on 14 December. This week, PV Tech also looked in detail at the ongoing anti-dumping investigation, which is another attempt to protect local manufacturers.

Read Next

May 15, 2026
India installed a record 15.3GW of solar capacity in the first quarter of 2026, according to new data from market research firm Mercom. 
May 15, 2026
Indian rooftop solar company Fujiyama Power has commissioned a 2GW solar module manufacturing facility in Ratlam, Madhya Pradesh. 
May 11, 2026
Bondada Engineering has secured a US$85 million contract for balance-of-system works on a 600MW solar PV project in Fatehgarh, Rajasthan. 
May 8, 2026
Solar PV installations have reached a record 14.4GW in the first quarter of 2026, according to a report from the Institute for Energy Economics and Financial Analysis (IEEFA).
May 5, 2026
PV inverter producers are adapting their manufacturing strategies to navigate changing policy and regulations, according to PV Tech Research.
May 5, 2026
Solex Energy has signed an MoU with the Government of Gujarat to establish a 5GW solar cell manufacturing facility alongside a 10GW energy storage plant in the state.  

Upcoming Events

Solar Media Events
May 20, 2026
Porto, Portugal
Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)