India’s largest utility NTPC has tendered 225MW of solar using local content rules at Billhaur in the state of Uttar Pradesh.

The tender comes under the Domestic Content Requirement  (DCR) category, which mandates equipment to be sourced locally.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The tender is for design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading, storage, installation and commissioning of the 225MW in a single block on  turnkey basis. O&M must be provided for 15 years.

In related news, Solar Energy Corporation of India has also issued a tender for EPC services on 5MW of solar also under DCR rules at Bharat Dynamics Limited, Ibrahimpatnam, in the state of Telangana. This includes five years of O&M services.

The DCR was a major support mechanism from the Indian government for its local manufacturers, but it was contested by the US at the WTO and is due to be srapped on 14 December. This week, PV Tech also looked in detail at the ongoing anti-dumping investigation, which is another attempt to protect local manufacturers.

Read Next

February 2, 2026
India’s Union Budget 2026-27 reinforces government support for renewables through duty exemptions and infrastructure spending.
January 30, 2026
India Power Corporation Limited has partnered with Bhutan’s Green Energy Power Private Limited to develop a 70MWp solar power plant in Paro, Bhutan
January 29, 2026
PV module defects are increasing as manufacturers struggle to achieve consistent quality through robust bill-of-material and process controls.
January 28, 2026
India’s power system faced growing integration challenges in 2025 as solar curtailment emerged as an early signal of insufficient grid flexibility, according to a new report from energy think tank Ember.
January 26, 2026
Indian solar manufacturer Premier Energies has commissioned its 400MW solar cell manufacturing plant in Maheshwaram, Telangana.  
January 23, 2026
MAHAPREIT has issued a tender for a 100MW floating solar project at the Tansa and Modak dams in Thane district, Maharashtra. 

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Upcoming Webinars
February 18, 2026
9am PST / 5pm GMT
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA