Oerlikon Solar’s ‘Micromorph’ technology tops 11% efficiency

June 3, 2009
Facebook
Twitter
LinkedIn
Reddit
Email

With amorphous silicon-based thin film technologies under pressure to boost conversion efficiencies to remain competitive with both CdTe and crystalline-based technologies, Oerlikon Solar has claimed that its own pilot production line has now seen full-size ‘Micromorph’ modules (1.4 m2) produce 151 Watts initial power, equivalent to 11% percent initial power conversion efficiency. According to the company, this is a new efficiency record for the technology.

“This achievement clearly demonstrates Oerlikon Solar’s technical leadership and is another key milestone on our path to grid parity”, stated Jeannine Sargent, CEO of Oerlikon Solar.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Oerlikon Solar has a production cost target of US$ 0.70 per Watt peak by the end of 2010. The company said that its focus on process optimization and integration of a proprietary process to deposit high-quality transparent conducting oxide (TCO) on the front and back surfaces was a key to the efficiency gains.

“We successfully implemented several modifications of key processes of our end-to-end production line, leading to the increase in initial power output and efficiency,” emphasized Dr. Juerg Henz, Head of Thin Film Engineering and Operations at Oerlikon Solar. “We are confident that our ability to repeatedly achieve record results can be transferred into mass production soon.”

Read Next

November 14, 2025
Spain-based developer Acciona Energia will add a gigawatt-hour-scale battery energy storage system (BESS) at its 238MWp Malgarida solar PV plant in Chile.
November 14, 2025
Lightsource bp has started construction on its 330MWp Valle 3 and 4 project in Wamba, Valladolid, in the Castilla y Leon region of Spain. 
November 14, 2025
Developer rPlus Energies has acquired two solar and storage projects with the total capacity of 900MW in Ada County, Idaho.
November 14, 2025
International solar manufacturer Canadian Solar has posted stable financials in Q3 2025, as its solar module and battery energy storage system (BESS) sales shift.
November 14, 2025
NSW has removed regulatory barriers that previously prevented owners of heritage-listed properties from installing rooftop solar.
November 13, 2025
QIC and EDP Renewables Australia have signed an agreement to develop a 400MWac solar-plus-storage project in Toowoomba, Queensland.

Upcoming Events

Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal
Solar Media Events
June 16, 2026
Napa, USA