Meyer Burger’s diamond wire saw enables ultrathin wafer production

Facebook
Twitter
LinkedIn
Reddit
Email

Meyer Burger is offering the DW 288+ as the first diamond wire saw system designed specifically for monocrystalline solar wafer applications. The DW 288 platform enables the slicing of silicon bricks into ultrathin wafers.

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Diamond wire cutting technology is now replacing slurry-based wafer processing. The first generations of machines for this purpose are currently being introduced into the market, but there is still potential for improvement in the diamond wire cutting process. On the basis of production experience and data analysis, diamond wire has proved to be by far the largest cost driver in the wafering process. A better understanding of the factors that influence the lifetime and performance of diamond wire is therefore necessary.

Solution

The DW 288+ is unique because it includes a brand-new technology for diamond wire management during the cutting process. This innovative and patented wire management system significantly increases the diamond wire performance and therefore helps to substantially reduce wafering costs, according to the company.

Applications

The DW 288 platform can be used to slice silicon, sapphire and other brittle materials.

Platform

Additional features of the wire saw, such as the wire-web monitoring system or the one-touch carrier system, allow integration in to the Meyer Burger ‘WaferLine’ for integrated production systems (IPS). Meyer Burger’s in-depth knowledge about the entire photovoltaic module production process enables the company to design products and product interfaces with optimised material flows and yields.

Availability

Currently available.

Read Next

June 20, 2025
Utility giant Engie North America has incorporated a precycling provision to incorporate solar panel and project component recycling into power purchase agreements (PPA) at four solar PV plants across the Midwest, US.
June 20, 2025
Akuo has signed a 15-year power purchase agreement (PPA) with Imerys to develop a solar power plant in Texas.
Premium
June 20, 2025
Panellists discuss some of the challenges in European solar's financial landscape at an event organised at Intersolar Europe 2025 by PV Tech.
June 20, 2025
The Energy Corporation of New South Wales (EnergyCo) has confirmed that construction on Australia’s first Renewable Energy Zone (REZ) has started.
June 20, 2025
The Australian government has given the green light for a landowner-led 250MW solar-plus-storage project in Tasmania.
June 19, 2025
Spanish independent power producer (IPP) Sonnedix has launched Project Douro, a 150MW solar plant in Tarouca, northern Portugal.

Subscribe to Newsletter

Upcoming Events

Upcoming Webinars
June 30, 2025
10am PST / 6pm BST
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Media Partners, Solar Media Events
July 2, 2025
Bangkok, Thailand
Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico