Product Review: PI Berlin offers in situ lab quality power measurements of PV power plants

Facebook
Twitter
LinkedIn
Reddit
Email
The device not only meets the current IEC 60904-9 standard but also satisfies the more rigorous forthcoming specifications.

Photovoltaik-Institut Berlin (PI Berlin) now has the capability to troubleshoot faults in PV power plants using a precision LED solar simulator. This device is the first of its kind to allow laboratory standard solar module power measurements to be taken in the field without the need to dismantle modules, according to the company. Until now, these measurements were only possible using mobile laboratories, which required modules to be removed from installations for testing. PI Berlin is presenting its new measurement method at this year’s Intersolar Europe exhibition in Munich, Germany, from 22–24 June 2016.

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

If a solar power plant fails to deliver the expected yield, this may be caused by a variety of factors. Power losses can often be traced back to the smallest of faults in PV modules, which aren’t recognized at first glance – for instance micro cracks in solar cells. To return a power plant to full productivity as rapidly as possible, faults and their relevance must be quickly pinpointed. With mobile labs out in the field you first need to dismantle several PV modules, which can take time and can also result in further damage to the modules.

Solution

The LED solar simulator was developed in collaboration with the innovative high-tech start-up Wavelabs and Zurich University of Applied Sciences (ZHAW), one of the leading Swiss universities of its kind, and with the support of the professional association Electrosuisse. The device not only meets the current IEC 60904-9 standard but also satisfies the more rigorous forthcoming specifications. It is set on the module substructure at the site, so there is no need to remove modules and the output measurements are quicker and cheaper. The precision LED sun simulator replicates sunlight so realistically that engineers are able to test module power output with extreme accuracy at any time of the day or year. Testing at night has the added advantage for operators that there is no plant downtime.

Applications

In situ PV power plant power measurements.

Platform

Class AAA LED solar simulator was developed in collaboration with the innovative high-tech start-up Wavelabs and Zurich University of Applied Sciences (ZHAW). The device not only meets the current IEC 60904-9 standard but also satisfies the more rigorous forthcoming specifications.

Availability

June 2016 onwards.

This device is the first of its kind to allow laboratory standard solar module power measurements to be taken in the field without the need to dismantle modules, according to the company.

Read Next

Premium
July 2, 2025
ANALYSIS: China's leading PV manufacturers are locked in a new round of competition, aiming to outpace each other through record-breaking feats.
June 30, 2025
Australian module manufacturer Tindo Solar has secured a 30MW solar module supply agreement to power Australia's first "net zero pipeline”.
June 27, 2025
Indian solar manufacturer Premier Energies has commissioned its 1.2GW TOPCon solar cell manufacturing line at Fab City, Hyderabad, Telangana.
June 26, 2025
PV solar cell manufacturer Halocell Energy has launched its first perovskite-based product called the Halocell Ambient Modules.
June 24, 2025
Chinese solar manufacturing giant LONGi has signed an agreement with Indonesia’s Pertamina New & Renewable Energy to build a 1.4GW module assembly plant in West Java, Indonesia.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 22, 2025
Bilbao, Spain
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK