SolarEdge’s most powerful PV inverter means large-scale meets easy installation

Facebook
Twitter
LinkedIn
Reddit
Email
The SE100KUS introduces the SolarEdge Inverter SetApp, a new, smartphone-enabled commissioning system. Image SolarEdge

SolarEdge is shipping its most powerful inverter product to date– the SE100KUS inverter for 277/480Vac commercial grids. The SE100KUS utilizes a bundling concept with three separate units to retain higher system uptime and availability. SolarEdge will also be offering a 66.6kW (277/480Vac) and a 43.2kW (208Vac) inverters based on its synergy technology which combines bundling with compartmentalization, as well as a 30kW (277/480Vac) inverter based on the standard architecture.

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Both central and string inverters have their own individual limitations and benefits. SolarEdge wanted to create an inverter that eliminated the drawbacks of both systems, yet provides the benefits of each. SolarEdge’s inverters with synergy technology enable PV systems to be designed and wired as if with a central inverter, but installed and serviced as if with string inverters.

Solution

The SE100KUS inverter can be installed by as few as two technicians, with no cranes, forklifts or other special tools, unlike the majority of large-capacity inverters, above 60kW, that require a crane or forklift or a multiple-person crew for installation. The separation of the units on the DC side in SolarEdge’s inverters with synergy technology means a forklift is not required for mounting. The inverter ships with all required cables and connectors and supports 9 separate DC string inputs and a single AC output. After onsite assembly, each unit maintains its functional integrity while bundling them together on the AC side for easy commissioning and less cabling. The individual units are managed and interact with the grid as a single inverter, while acting independently for DC-AC conversion. This allows for higher system uptime and decreased maintenance costs. If one unit fails, others function unimpeded. If a standard 120kW inverter fails, a large array suffers downtime. With synergy technology, the fault is isolated, and ≤66kW still generates. Installers can benefit from reduced Balance of System (BOS) and labour costs compared to multiple smaller string inverters.  The inverter ships with built in RS485 surge protection device.

Applications

Commercial and utility-scale PV power plants. 

Platform

The SE100KUS introduces the SolarEdge Inverter SetApp, a new, smartphone-enabled commissioning system. Installers can now commission and configure up to 32 inverters simultaneously (up to 3.2MWac) from a single main inverter using a smartphone app and a local WiFi connection (available via the App Store and Google Play). The inverter ships with the latest in code and compliance with out-of-the-box support for Rapid Shutdown (NEC 2017) and is UL1741 SA certified for CPUC Rule 21 grid compliance. The SE100KUS, SE66.6KUS, SE43.2KUS, SE30KUS, P800s, P800p are now all supported by the main commercial design software suites.

Availability

Second quarter of 2018, onwards.

Read Next

May 29, 2026
Zelestra has completed the sale of its Latin America platform to Promigas in a deal valued at approximately US$1.1 billion.
May 29, 2026
BHP and Yindjibarndi Energy Corporation (YEC) will assess potential large-scale energy solutions for iron ore operations in Western Australia's Pilbara region.
May 28, 2026
India added around 14.2GW of solar energy capacity in the first quarter of 2026, a roughly 95% increase from the previous quarter, according to Indian research firm JMK Research.
May 28, 2026
NextEnergy Capital has secured US$974 million towards its NextPower V solar and energy storage investment vehicle.
May 27, 2026
Enlight Renewable Energy has signed a 15-year power purchase agreement (PPA) with Google for a 200MWac solar offtake in Oklahoma.
May 27, 2026
DESRI and Tierra Adentro Growth Capital (TAGC) have broken ground on two solar-plus-storage projects in New Mexico.

Upcoming Events

Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil