PSEG Solar Source acquires 214.6MW of assets from juwi

Facebook
Twitter
LinkedIn
Reddit
Email
Both PV projects are expected to be completed in 2016. Image: PSEG

PSEG Solar Source announced that it has acquired two solar projects from juwi — a 3.9MW facility in Livermore, California, and a 62.7MW site in Millard County, Utah.

These two projects stand as a total investment of around US$110 million and will boost PSEG Solar Source’s total portfolio to 214.6MW.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The PSEG Pavant II Solar Energy Center will be located on 167 hectares of land 177 kilometres south of Salt Lake City. Once completed, the installation will stand as Solar Source’s largest PV facility — capable of generating more than twice the amount of renewable energy than any other Solar Source facility. The site has a 20-year power purchase agreement (PPA) with PacifiCorp and is expected to be operational by the end of 2016.

Diana Drysdale, president of PSEG Solar Source, said: “We are excited to add such a large solar installment to our fleet and extend our presence into Utah providing safe, clean and reliable energy for so many residents.”

The 3.9MW site, which will be named PSEG Lawrence Livermore Solar Energy Center, is currently under construction by juwi and will be located 72 kilometres east of San Francisco. It is expected to commence operations in the first quarter of 2016 and already has a 20-year PPA with Western Area Power Authority (WAPA).

Mike Martin, juwi's President and CEO, added: “We are pleased to be building our second large-scale solar project in the state ofUtah and our first one in California. Our partnership with PSEG Solar Source has been tremendously successful over the years, and we are proud that companies like PSEG continue to dedicate significant resources and efforts to the renewable energy industry.”

Read Next

August 5, 2026
Avantus has closed a US$1.05 billion corporate credit facility, doubling the US$522 million facility it secured in July 2024.
August 5, 2026
US module manufacturer DYCM Solar Modules has closed an investment round to fund the growth of its business and its solar module assembly plant in California, US.
July 30, 2026
EDPR has agreed to sell an 80% equity stake in a 384MW solar-plus-storage portfolio in the US to a Private equity firm Ares Infrastructure.
July 21, 2026
Avantus has started commercial operations at its Aratina 1 project in California, which combines 200MW of solar PV and 500MWh of batteries.
July 15, 2026
Avantus has signed a 20-year PPA with the Clean Power Alliance (CPA) in California for the output of a 200MW solar-plus-storage project.
July 13, 2026
Independent power producer (IPP) Avantus has closed a US$525 million financing package for its Aratina 2 solar-plus-storage project in Southern California, US.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye