Adding intelligent storage can boost solar project revenues by 50%, Stem claims

Facebook
Twitter
LinkedIn
Reddit
Email
Image: Stem.

Adding energy storage can boost solar PV project revenues by as much as 50% in the US state of Massachusetts, US developer Stem Inc has claimed.

The storage provider made the claim while announcing the completion of a front-of-meter solar project that boasts 8MWh of storage. That project, located near Springfield, MA, is one of four AC-coupled front-of-meter projects Stem is working on alongside Syncarpha.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

It combines just under 5MW of solar with the storage capacity and marks Stem’s debut as an independent power producer (IPP).

Energy storage deployment in Massachusetts has been driven by a number of supportive policies. The state has a target in place to deploy 200MWh of storage by the end of this year and 1,000MWh by 2025.

In a recent interview with sister publication Energy-Storage.news, Jason Burwen, policy director of the national Energy Storage Association told this site that the state’s leaders, including Governor Charlie Baker, have chosen to pursue that target “not through a single energy storage policy” but “through distributing energy storage into many different programmes and feeding it through those” in an interview on state-level targets for storage published this week. 

Stem Inc representatives said the Blandford project time-shifts solar-generated energy to help the local grid meet that Clean Peak Standard. Also important to Massachusetts distributed energy resources is the availability of participation in the regional ISO New England transmission system operator’s wholesale markets.

The front-of-meter system can deliver energy, capacity and ancillary services on a market basis in this way. Behind-the-meter projects in the state can also earn extra revenues through enrolment in demand response programmes and managing their own demand charges, while battery storage also offers some scope to do energy arbitrage. 

This story is adapted from a version first published on sister publication Energy-Storage.news. To read the full version, click here.

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2028 and beyond.
13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States.

Read Next

May 21, 2026
US solar glass producer Stewart Glass is expanding its facility in Ohio with a new production line expected in 2027.
May 21, 2026
Spanish independent power producer Grenergy has signed a long-term hybrid power purchase agreement (PPA) with US utility Georgia Power.
May 20, 2026
Canadian energy firm Enbridge will develop a 365MW/1,600MWh solar-plus-storage project in Wyoming, US, as part of an ongoing partnership with tech and data giant Meta.
May 20, 2026
The California Independent System Operator (CAISO) Board of Governors has approved the ISO’s 2025-2026 transmission plan, which accommodates 45 GW of new solar PV.
May 20, 2026
Price is the main barrier to PPAs being transacted in the UK market today, a panel at the Renewable Procurement and Revenue Summit said.
May 19, 2026
Michigan power utility DTE Energy has issued a tender for 1GW of new solar PV and wind power projects across the state.

Upcoming Events

Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA