Brazil registers 13.4GW solar for 2016’s sole PV and wind auction

Facebook
Twitter
LinkedIn
Reddit
Email
After a major auction shake up, EPE allowed more projects to be submitted for teh second reserve auction. Flickr: Global Economic Symposium

Brazil’s energy agency EPE has registered 1,260 wind and solar projects for its 2nd Reserve Energy Auction 2016 to be held on 16 December, the only solar auction in Brazil this year.

There are now 841 wind projects (21,760MW) and 419 solar PV projects (13,388MW) registered and cleared to participate in the auction.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The top six states for solar capacity registered were:

  • Bahi – 101 projects at 3,155MW
  • Piaui – 55 projects at 2,057MW
  • Rio Grande do Norte – 58 projects at 1,640MW
  • Sao Paulo – 53 projects at 1,598MW
  • Mato Grosso do Sul – 21 projects at 1,220MW
  • Ceara – 36 projects at 1,046MW

Brazil recently removed solar from the first reserve energy auction, which is now solely for hydropower. It also significantly delayed the second reserve auction to December. Before this happened, EPE had accredited 12.5GW of wind and solar projects, of which 393 were solar-based. As a result of the auction shake up it allowed for more projects to be submitted in the second auction.

Read Next

March 7, 2025
Solar PV growth is expected to slow down in Brazil and Chile due to ongoing issues of curtailment and transmission infrastructure.
November 15, 2024
The Brazilian government has raised the import tax rate on solar modules this week (12 November) from 9.6% to 25%.
September 5, 2024
Voltalia has published its financial results for the first half of 2024, which include a 28% increase in turnover compared to H1 2023.
September 3, 2024
The Brazilian Development Bank (BNDES) has raised R$1.14 billion (US$200 million) to support the development of 402MW of new solar capacity.
August 28, 2024
Seraphim will ship 300MW of modules to Vertys, predominantly 585W n-type tunnel oxide passivated contact (TOPCon) and 610W rectangular-cell modules.
August 27, 2024
PV Cycle said it will financially support SunR’s expansion in Brazil and the wider LATAM region and as part of its ongoing business development plan.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
March 18, 2025
Sydney, Australia
Upcoming Webinars
March 19, 2025
11am EST / 4pm GMT / 5pm CET
Solar Media Events
March 25, 2025
Lisbon, Portugal
Solar Media Events
March 26, 2025
Renaissance Dallas Addison Hotel, Dallas, Texas