#LSSEU: Doubts remain over necessity of Spain’s new renewables auction system

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on reddit
Reddit
Share on email
Email
Image: X-Elio

Questions have been raised about the need for Spain to roll out a new renewables auction mechanism to drive up PV installation rates and meet its 2030 green energy targets.

While recognising the significant opportunity that the Spanish PV market presents, some panellists speaking at the Large Scale Solar Europe Virtual Summit event this week urged caution as to the effectiveness of the new auction system.

Spain’s Council of Ministers approved a royal decree earlier this month for the pay-as-bid auctions that will allow hybridisation between technologies and be compatible with energy storage, with at least 1GW of solar PV capacity set to be put up for auction before the end of this year. It is hoped the new auctions will encourage investment and help the country reach 60GW of renewables capacity by 2030.

“We see the auction as an artificial interference on market pricing,” said José Antonio Urquizu, founding partner of Spanish investment firm Everwood Capital. “We see right now that the sector is attractive enough to attract capital and we see that the projects are being built and are being developed on a merchant basis and are being financed also on a merchant basis without any auctions in place.”

Urquizu said the government is doing a “lot of positive things”, such as organising regulatory activity, but believes more resources should be devoted to permitting if the country is to achieve its green energy targets. “We think that the main challenge right now is the speed at which the permitting process is advancing and the blockage in the administration.”

When announcing the new auction model, Spain’s government said it responds to the need to offer a stable framework that attracts investment and encourages economic activity. An indicative calendar foresees a total of around 19.4GW of renewables to be assigned through auctions between now and 2025, with at least 10GW of that capacity to be solar PV.

Fernando de Juan Astray, head of origination and long term products at Axpo Iberia, said there are fears that the auction system sends the wrong signals to the market. With Spain already achieving its installation targets through merchant-based projects, he said: “These auctions are not really necessary.”

With Spain’s last renewables auction taking place in 2017, a more optimistic tone was taken during the panel discussion by Jaime Vázquez, director of regulation at PV project developer X-Elio, who said it is necessary to differentiate between the two different systems.

“There are a lot of similarities, especially on the milestones, but the crucial difference is obviously on the price. The last auction was a very complicated system to come to a price that everybody shared, so it was not really competitive; these auctions on the other side are competitive on price.” Vázquez added that with the auctions based on price, it is similar to having a power purchase agreement negotiated with the government.

Having unveiled the initial schedule this month, Spain is set to update its auctioning calendar annually to ensure the country is on the path to achieving its 2030 climate targets, which includes the installation of 37GW of solar PV. 

Ana Barillas, principal at Aurora Energy Research, said that while the auction system will help in providing some stability to Spain’s solar development pipeline, the risk is that “all of the focus turns into the auctions and that there's not enough left for merchant development to mitigate some of the risk”. 

Solar Media's Large Scale Solar Europe Virtual Summit concludes today, however there remain ample sessions and networking opportunities to enjoy. All sessions are to remain available on demand throughout the week, and the event's networking opportunities will also remain accessible. For more details on how to attend and participate, click here

Read Next

PV Tech Premium
September 24, 2021
Concerns have been raised that new measures introduced by Spain’s government to limit windfall profits of renewable energy plants could dent investor confidence and impact the stability of the country’s solar sector.
September 23, 2021
Russian wholesale electricity market administrator JSC ATS has allocated 775MW of solar PV in the country’s eighth auction round for largescale renewables, which had an average price of ₽5.18/kWh (US$0.071/kWh)
PV Tech Premium
September 15, 2021
Record-breaking power prices across Europe have turned the spotlight on the role fossil fuel plants play in generating electricity and how the transition to renewables-plus-storage could lower consumer bills.
September 14, 2021
Polish renewables developer PAD-RES is to be acquired by a joint venture established by real estate investor Kajima and private equity firm Griffin Real Estate.
September 8, 2021
Sonnedix, Opdenergy and Canadian Solar were among the five successful bidders in Chile’s latest power auction, which took place yesterday (7 September) and will see the country support 2GW of renewables and storage installations.
September 7, 2021
Supply disruptions in the coal and gas sectors have contributed to record electricity costs across Europe, leading to calls for more support for renewables generation to mitigate future price rises.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
October 6, 2021
Solar Media Events
October 19, 2021
BRISTOL, UK
Solar Media Events
December 1, 2021