EDF Renewables North America completes 275MWdc solar project in Nevada

Latest

Facebook
Twitter
LinkedIn
Reddit
Email
The project began construction in September 2021 with the solar portion completed in December 2022. Image: EDF Renewables.

French power company EDF Renewables’ subsidiary EDF Renewables North America has completed the 275MWdc Arrow Canyon solar plus storage project in Nevada.

Situated on the Moapa Indian Reservation in Clark County, Nevada, the project also has a 75MW/375MWh (5-hour) battery energy storage system. The project consists of 621,000 bifacial solar PV modules in conjunction with 564 battery segments.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The project began construction in September 2021, with the solar portion completed in December 2022 and the storage portion completed in November 2023.

“Arrow Canyon represents an important milestone for EDF Renewables as it marks our first solar and storage project in Nevada. We are pleased to have collaborated closely with our partners, including the Moapa Band of Paiutes, NV Energy, and McCarthy Building Companies to successfully bring this project to fruition,” said Ryan Pfaff, executive vice president of EDF Renewables.

Earlier this month, EDF Renewables North America signed an agreement with solar recycling firm Solarcycle to recycle all damaged or broken solar modules from its utility-scale, distribution-scale and on-site solar installations.

EDF said that it chose Solarcycle for the partnership due to its “proven high-value recycling process”. Solarcycle’s recycling model is based on extracting maximum value from PV modules – notably the silver and copper alongside the glass and aluminium framing of the modules – to make the process as financially viable as possible to asset owners.

In September, EDF Renewables in North America signed a 150MW solar-plus-storage 20-year power purchase agreement (PPA) with utility El Paso Electric in New Mexico, US. This marks the first solar-plus-storage project for EDF Renewables in New Mexico, with the battery storage side sized at 75MW output and 300MWh capacity (4-hour duration).

21 May 2024
Understanding the PV module supply to the U.S. market in 2024 & 2025. The conference gathers together developers, independent power producers and module suppliers to the U.S. solar market as well as EPCs, banks, investors, technical advisory and testing & certification specialists.

Read Next

Subscribe to Newsletter

Most Read

Upcoming Events