Enphase Energy continues strong revenue growth despite supply constraints, adds new battery storage capacity following high demand

Facebook
Twitter
LinkedIn
Reddit
Email
Enphase said it started production shipments of its IQ8 microinverters for customers in North America in Q4. Image: Enphase

Microinverter supplier Enphase Energy has posted strong Q4 2021 results that saw strong revenue growth following high demand for its IQ microinverters and a 53% jump in orders of its IQ batteries, compared with Q3 2021, despite supply chain constraints. In response to the surge in demand for batteries, it has added extra capacity to its facilities in Mexico and India.

Alongside the revenue growth came a significant ramp up of investment in research and development (R&D) and sales and marketing from last year. The company also made a number of key acquisitions in Q4 last year as it seeks to move into the electric vehicle (EV) and predictive software space.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Enphase recorded US$412.7 million in revenue for the three months ending 31 December 2021, up from US$351.5 million in Q3 2021, according to its Q4 2021 financial results released yesterday (8 February). This was a 17% jump on the record revenue posted in Q3 2021.  

It said strong demand for its IQ microinverters and IQ Batteries in the US and international markets drove the increased revenue despite “supply chain constraints and logistical challenges”.

Enphase shipped roughly 3,033,891 microinverters totalling 1,082MWdc and 100MWh of Enphase IQ Batteries. In Q3, it shipped 2.6 million microinverters, equivalent to around 913MWdc, and 65MWh of storage systems.

Speaking to analysts about the results, Enphase CEO Badri Kothandaraman said: “Our operations team did a great job flexing manufacturing as 2021 played out” and that the company’s “situation has been stable primarily due to diligent supplier management and qualification of alternate suppliers during the past year”.

In a response to the higher demand, Enphase had added a fully automated line in Mexico with a capacity of 2.25 million microinverters and a second fully automated line with a capacity of 1.5 million microinverters in India via its contract manufacturer Salcomp. In combination with its Chinese capacity, this brings its total quarterly manufacturing capacity to 5 million microinverters worldwide.

Meanwhile, the company has 180MWh of storage capacity today, up from 120MWh in Q3, and is in discussions with additional storage suppliers to increase capacity further, it said.

“Our lead times for batteries are still long today at approximately 14 to 16 weeks primarily due to logistics challenges, which are global,” said Kothandaraman. “The lead times should come down once global shipping and port conditions improve.”

Enphase expects to ship between 110-120MWh of batteries in Q1 this year, said Kothandaraman, up 15% from Q4 last year. But expect prices for Enphase’s battery storage products to go up in March this year, Kothandaraman told analysts.

The company expects revenue of US$420-440 million in Q1 versus prior estimate of US$397 million, according to a ROTH Capital note that added the better-than-expected figures are “due in part to anticipated growth in storage as Enphase expects to ship 110-120MWh of storage in Q1 for implied sequential growth of 15% versus prior ROTH estimate of 105MWh.”

Eyeing future development opportunities, Enphase more than doubled it expenditure on R&D in Q4 compared with the same period in 2020, with the company investing US$31.6 million into research, up from US$15.8 million. It also more than tripled its sales and marketing investments from Q4 2020 and it now stands at US$44.5 million, up from US$14.1 million.

On top of this, Enphase made two key acquisitions in Q4. In November 2021, it entered the EV charging sector with the acquisition of charging station manufacturer ClipperCreek. And, also in Q4, it acquired predictive software platform company 365 Pronto.

While its net income was down 28% from Q4 2020 to US$52.6 million, it was up more than double on the previous quarter, where it was US$21.8 million. Its full-year revenue reached US$1.38 billion during 2021, up from US$774.4 million in 2020, and it generated a record US$352 million in cash flow from operations during 2021.

Enphase’s shares rose by more than 16% during trading on Tuesday following the Q4 results.

Analyst commentary was sourced from Motley Fool.

3 October 2024
India Expo Centre, Greater Noida
Welcome to the 2nd edition of The Battery Show India, where brilliance meets innovation! Join us as we unite engineers, business leaders, top-industry companies, and visionary thinkers from across the globe. Together, we'll unlock the door to ground-breaking products, explore the latest advancements, and forge powerful solutions that will shape the future. Prepare to be energized like never before! See you on 03-04-05 October 2024. at India Expo Centre, Greater Noida.
7 October 2024
Huntington Place Detroit, MI
The Battery Show and EVT Expo is moving! Now entering its 14th year, North America’s largest advanced battery event will take over Huntington Place in Downtown Detroit this October. The Battery Show brings together engineers, business leaders, top-industry companies, and innovative thinkers to discover ground-breaking products and create powerful solutions for the future. More than 19,000 attendees are expected to take advantage of four full days of educational sessions, networking opportunities and, of course, explore the latest market innovations from over 1,150 exhibitors across one of the world’s largest battery technology trade shows. Become part of this great event!
24 October 2024
4pm BST
FREE WEBINAR - Recent changes in legislation around the world have spurred a new wave of factory building globally with new factories in the U.S., Europe and Southeast Asia. Increased ESG requirements in Europe mean that module buyers are applying new criteria to their module selection process and will be considering PV modules from new suppliers and manufacturers located outside of China. This creates new challenges for testing and inspection of PV Modules as they consider new module suppliers and update their due diligence processes.
3 June 2025
Messe Stuttgart Stuttgart, Germany
Meet battery manufacturers, suppliers, engineers, thought leaders and decision-makers for a conference and battery tech expo focused on the latest developments in the advanced battery and automotive industries. Stay plugged in for all the latest information on The Battery Show Europe 2024 including: Keynote Speakers & Conference Overview Show Features Floor Plan & Exhibitor News Travel & Transport information

Read Next

September 20, 2024
Non-profit organisation Climate Council has signalled that Australia, the global leader in rooftop solar PV installations, could add a further 26.4GW by the end of the decade, bringing its total to 49.4GW.
September 18, 2024
LONGi has released its performance report for H1 2024, which includes the shipment of close to 80GW of cells, wafers and modules.
September 6, 2024
US-based inverter producer Enphase Energy has released a product that it claims can increase access to solar for legacy net energy metering (NEM) customers in California.
September 5, 2024
Voltalia has published its financial results for the first half of 2024, which include a 28% increase in turnover compared to H1 2023.
September 4, 2024
Toyo Solar has announced plans to build a 2GW module manufacturing plant in the US, which it plans to commission next year.
September 3, 2024
Maxeon has published losses of US$7.8 million, alongside falling module shipments, in its financial results covering Q2 2024.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 24, 2024
Warsaw, Poland
Solar Media Events
October 7, 2024
Huntington Place Detroit, MI
Solar Media Events
October 8, 2024
San Francisco Bay Area, USA