Jolywood shipping major order of nTOPCon bifacial modules to Oman Ibri II PV project

May 14, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
Jolywood is supplying 458MW of nTOPCon bifacial modules to the project, its largest single order for this technology. Image: ACWA Power

China-based PV backsheet and high-efficiency PV manufacturer Jolywood (Suzhou) Sunwatt Co has started deliveries of its n-type TOPCon (Tunnel Oxide Passivated Contact) high-efficiency bifacial solar modules to the 500MW-plus Oman Ibri II venture, a PV project being built by ACWA Power. 

Jolywood is supplying 458MW of nTOPCon bifacial modules to the project, its largest single order for this technology, after supplying a 125MW batch to an Oman Marubeni project in 2019. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The Oman Ibri II 500MW PV project consortium includes ACWA Power, Gulf Investment Corporation (GIC), and Alternative Energy Projects Co. (AEPC) in agreement with the Oman Power and Water Procurement Company (“OPWP”). ACWA Power is the lead investor in the project. 

PV manufacturer Jolywood had previously achieved a conversion efficiency of 23.2% at the end of 2019. A new 0.3% higher efficiency cell was achieved with an optimised homogeneous boron emitter, featuring Al2O3/SiNx as passivation films and a metallisation process for better contact, according to the company. As a production-ready process, Jolywood used n-type 158.75mm x 158.75 (G1) silicon wafers to achieve the recent record conversion efficiency.

Jolywood noted that its n-type modules had a low temperature coefficient and a module bifaciality in the range of 80-85%, achieving 20% higher bifacialty than p-type bifacial products.

Jolywood is supplying 458MW of nTOPCon bifacial modules to the project, its largest single order for this technology, after supplying a 125MW batch to an Oman Marubeni project in 2019. Image: Jolywood

Read Next

March 23, 2026
The Ohio Power Siting Board (OPSB) has denied the development of a 94MW solar project following “substantial” opposition from local residents.
March 23, 2026
Zelestra has started commercial operations at three solar PV plants—Belinchón I, II and III—with a combined capacity of 162MW in Spain.
March 20, 2026
Since the start of March, several leading Chinese PV manufacturers have announced overseas module supply agreements.
March 20, 2026
Goldbeck Solar has secured an EPC contract to deliver three PV plants in Poland’s West Pomeranian province, with a combined installed capacity of 722MWp.
March 20, 2026
Danantara, has secured US$1.4 billion to back the government’s push for 50GW of new renewable energy capacity by 2035, with a focus on solar.
March 20, 2026
Global solar PV installations reached 647GW in 2025, up 11% from the previous year, according to data from think tank Ember.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain