First Solar commissions 250MW Moapa project

March 20, 2017
Facebook
Twitter
LinkedIn
Reddit
Email
US senators Dean Heller and Catherine Cortez Masto at the commissioning ceremony of the 250MW Moapa Southern Paiute Solar Project on Friday morning. Source: Business Wire

Leading CdTe thin-film producer First Solar has brought online the first ever utility-scale solar project on tribal land in the US, the 250MW Moapa project, located just 30 miles north of Las Vegas.

“As a first-of-its-kind project, the Moapa Southern Paiute Solar Project signifies our role as a leader in Indian Country, creating a template for other tribes to follow,” said Darren Daboda, chairman of the Moapa Band of Paiutes Tribal Council. “If our small tribe can accomplish this, then others can also. There are endless opportunities in renewable energy, and tribes across the nation have the perfect areas in which to build utility-scale projects.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The project has a 25-year PPA with the Los Angeles Department of Water and Power (LADWP), producing enough clean energy to power around 111,000 homes in LA.

It was constructed and operated by First Solar, and features more than 3.2 million advanced First Solar thin-film modules. The project will also displace around 341,000 tonnes of carbon dioxide emissions annually.

“I’m proud to see the day has finally arrived to commission the Moapa Southern Paiute Solar Project. The tribe is truly embarking on a new journey while serving as a trendsetter with this venture. This project is the first and largest utility-scale solar plant on tribal lands. Nevada is no stranger to successful solar projects, and this is another great example of that. Again, congratulations to the tribe on its impending success,” said US senator Dean Heller, at the commission ceremony on Friday morning.

Heller was also joined by fellow senator Catherine Cortez Masto and leaders of the Moapa Band of Paiutes, as well as representatives from the Department of Energy (DOE), Bureau of Land Management (BLM) and the Bureau of Indian Affairs.

“There is no doubt renewable energy is the way of the future for energy sustainability, and Nevada has the unparalleled natural resources to be a national leader in investment and development of clean energy technology and job creation,” said Cortez Masto. “The Moapa Southern Paiute Solar Project is the perfect example of this great potential. I will continue to fight for common sense policies and projects like this one to reduce our dependence on fossil fuels, invest in clean energy, and create good paying jobs.”

We look forward to doing more projects like this in Nevada,” said Georges Antoun, chief commercial officer for First Solar. “Our PV technology is setting the standard for affordable, clean renewable energy. By continuously innovating, we are driving down the cost of solar electricity and providing a solution that addresses energy security and water scarcity. We are delivering on our commitment to build a more sustainable energy future.”

First Solar revealed in an earnings call in November that it aims to sell the Moapa project in the first quarter of this year, alongside its California Flats project, to help fill a 2017 revenue gap.

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2027 and beyond.

Read Next

November 19, 2025
The US Department of Energy (DOE) will need to invest US$25 billion by 2030 to maintain its position as a leader in the global energy sector.
Premium
November 18, 2025
PV Talk: George Touloupas of Intertek CEA explains how the regulatory environment is ratcheting up for the solar supply chain.
November 17, 2025
US solar module manufacturer First Solar will build a new production facility in the state of South Carolina, which will bring its US nameplate manufacturing capacity to 17.7GW by 2027.
November 14, 2025
Developer rPlus Energies has acquired two solar and storage projects with the total capacity of 900MW in Ada County, Idaho.
November 14, 2025
International solar manufacturer Canadian Solar has posted stable financials in Q3 2025, as its solar module and battery energy storage system (BESS) sales shift.
November 13, 2025
US solar hardware manufacturer Create Energy and Swiss cable producer Stäubli have announced a partnership to produce a new solar connector product.

Upcoming Events

Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal
Solar Media Events
June 16, 2026
Napa, USA