Germany launches second combined solar and wind tender

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: Hanwha Q CELLS.

Germany has launched its second combined onshore wind and solar power tender.

The first was run in April this year with the average successful tariff for projects coming in at 4.67 euro cents per kWh (US$0.0467/kWh). All the winning projects were PV. The average onshore wind bid was 7.23 euro cents per kWh.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The country’s Federal Network Agency, the Bundesnetzagentur, will close the bidding process for the next round on 2 November 2018. Bids must be below 8.75 euro cents per kWh in order to be eligible.

Proposed installations in areas that already have a high penetration of renewable energy will be subject to a surcharge to cover the additional cost of their integration and distribution on those grids. The intention is to increase the likelihood of winning capacity being added outside of these areas.

Full details of the tender can be reviewed here.

2 December 2025
Málaga, Spain
Understanding PV module supply to the European market in 2026. PV ModuleTech Europe 2025 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of module supplier selection; product availability, technology offerings, traceability of supply-chain, factory auditing, module testing and reliability, and company bankability.
10 March 2026
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

September 18, 2025
CERC is finalising guidelines for virtual power purchase agreements (vPPAs) to unlock financing for over 40GW of uncontracted renewable capacity.
September 18, 2025
Indian PV makers have welcomed the government’s plan to add solar wafers to its ALMM List-III from June 2028.
September 17, 2025
Spanish renewables developer and operator Acciona Energía has commissioned its 412MWp Juna solar PV plant in Kawani village in the western state of Rajasthan. 
September 17, 2025
Struggling Swiss solar manufacturer Meyer Burger has formally entered into a debt moratorium, with the possibility of rescuing the entire group now looking unlikely.
September 17, 2025
Nexamp has secured US$350 million through a long-term financing facility to expand its 6GW utility-scale solar and battery storage pipeline in the US. 
September 17, 2025
QatarEnergy has signed an EPC agreement with Samsung C&T for its 2GW Dukhan project. 

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK
Solar Media Events
October 7, 2025
Manila, Philippines
Solar Media Events
October 7, 2025
San Francisco Bay Area, USA