India deployed more than 25GW of solar by 2019 - Ministry

Facebook
Twitter
LinkedIn
Reddit
Email
The government released more than US$500 million of financial assistance to the Ministry of New and Renewable Energy (MNRE) last fiscal year. Credit: TPREL

India's total solar PV deployment hit 25.21GW by the end of last year, according to figures supplied to parliament by the minister for new and renewable energy and power, R.K. Singh.

Consultancy firm Bridge to India has earlier also reported that India had passed the 25GW milestone in the second half of last year.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

As of 31 December 2018, India had a total of 74.79GW of renewable energy installed, spread across the following sources:

  • Solar – 25.21GW
  • Wind – 35.14GW
  • Bio Power – 9.92GW
  • Small Hydro Power – 4.52GW

Singh reported that the government has released INR 35.8 billion (~US$507 million) of subsidies to the programmes of the Ministry of New and Renewable Energy (MNRE) in the form of Central Financial Assistance (CFA) during the fiscal year 2018-19, up to 5 February this year.

The State of Tamil Nadu recently announced plans to become a global clean energy leader with a 9GW solar target by 2023. The state of Andhra Pradesh has followed suit with a 5GW target by 2023, including 4GW in solar parks, 50,000 solar power pump sets, and the promotion of local manufacturing. Indeed, India's Cabinet Committee on Economic Affairs (CCEA), chaired by the Prime Minister Narendra Modi, has approved a 12GW solar scheme for central public sector undertakings (CPSUs), which mandates the use of domestically sourced solar cells and modules in the latest attempt to cultivate a local PV manufacturing base in India.

The Indian government is considering a solar for farmers scheme known as ‘Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM)’ which supported grid-connected projects of 500kW-2MW in size, installation of standalone off-grid solar water pumps to fulfil irrigation needs of farmers not connected to the grid and adding solar to existing grid-connected agriculture pumps.

India’s renewable energy deployment is expected to grow by 50% year-on-year in 2019 with a total of 15,860MW of installations, according to the latest report by consultancy firm Bridge to India.

Read Next

Premium
July 21, 2026
'Home market strength plus Middle Eastern demand' has driven a surge in solar PV capacity in India, according to RenewAtlas and Wiki-Solar.
July 20, 2026
India's renewable energy ministry has extended the exemption from the ALMM List-II on PV cells for net-metering and open-access solar projects until the end of December 2026.
July 16, 2026
Alpex Solar expects commercial production to begin in August 2026 at its 2.2 GW TOPCon G12R solar cell facility in Kosi Kotwan, Mathura, UP.
July 15, 2026
Bluebird Solar has secured a 439.35 MW order from Indian state-owned power producer NTPC Renewable Energy Limited (NTPC REL).
July 15, 2026
CERC issues suo motu order to release interstate transmission connectivity reserved for renewable projects that failed to secure PPAs.
July 14, 2026
Shell Overseas Investment, a wholly owned subsidiary of oil and gas giant Shell, has signed an agreement to sell 100% of Solenergi Power Private to renewables platform Aditya Birla Renewables (ABRen).

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
April 20, 2027
Istanbul, Türkiye