Indian Railways to develop 20GW of solar on vacant land by 2030

Facebook
Twitter
LinkedIn
Reddit
Email
Indian Railways expects to achieve 100% electrification by 2023. Image: Flickr/Belur Ashok.

Indian Railways has revealed plans to install 20GW of solar as it ramps up efforts to become a net-zero carbon emitter before 2030. The government-run company, which transports 8 billion passengers per year, said about 51,000 hectares of vacant land is available for solar developments. 

Developers recently attended a meeting alongside Indian railways minister Piyush Goyal to discuss innovative solutions for setting up solar projects alongside railway tracks. Bids for 3GW of solar projects on vacant land parcels as well as sections of land alongside railway tracks have already been invited by the Ministry of Railways and Indian Railways joint venture (JV) entity Railway Energy Management Company.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

To help in its objective of becoming 100% self-sustainable for all its power needs, Indian Railways has so far installed solar panels at more than 960 stations, including those at Varanasi, New Delhi, Jaipur, Secunderabad, Kolkata and Hyderabad. Orders have also been placed for 198MW of solar rooftop capacity for 550 additional stations.

The developments come after Indian Railways earlier this year announced plans to install 1GW of solar PV and 200MW of wind power by 2021-22 across its Zonal Railways and Production Units. By that deadline, the company will install 500MW across rooftops of its railway buildings, complemented with another 500MW of ground-mount PV.

Indian Railways also said this week it is set to achieve 100% electrification of its rail tracks by 2023.

Read Next

August 14, 2025
Cells and wafers have accounted for 22% and 20%, respectively, of China’s product exports in the first half of 2025, according to Ember.
August 13, 2025
Juniper Green Energy has secured INR17.39 billion (US$197 million) in debt financing from government-backed Indian Renewable Energy Development Agency (IREDA). 
August 11, 2025
The US Department of Commerce has initiated antidumping duty and countervailing duty investigations of crystalline silicon PV cells, whether or not assembled into modules from India, Indonesia, and Laos.
August 6, 2025
The Indian Ministry of New and Renewable Energy (MNRE) has published the approved list of models and manufacturers (ALMM) for solar cells, which contains 13GW of annual nameplate capacity across six manufacturers.
August 4, 2025
Indian solar PV module manufacturer Vikram Solar will supply 250MW of n-type modules to Bondada Group for its solar project in Maharashtra.
August 4, 2025
Waaree Energies has commissioned a 1.8GW solar module manufacturing line at its factory in Chikhli, Navsari district, Gujarat.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK
Solar Media Events
October 7, 2025
Manila, Philippines