Indian standards body approves TUV Rheinland’s solar equipment test lab in Bangalore

November 29, 2018
Facebook
Twitter
LinkedIn
Reddit
Email
Manufacturers can now approach TUV Rheinland for testing, in order to comply with BIS requirements. Credit: TUV

Major certification body the Bureau of Indian Standards (BIS) has recognised TUV Rheinland's PV testing laboratory located in Bangalore, India, so that the lab is now authorised to conduct testing of solar modules.

While Indian authorities have made efforts to improve the quality of PV in India, with some projects clearly underperforming and the news of poor quality compounded by a damning report from PI Berlin, new standards and testing protocols have been undermined by a lack of available test labs across India.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Manufacturers can now approach TUV Rheinland for testing, in order to comply with BIS requirements, under the Compulsory Registration Scheme (CRS) and in line with the Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017. The rules for manufacturers of PV modules, inverters and batteries include a mandate to apply for registration from BIS following their products undergoing testing from a BIS-recognized lab. BIS then registers manufacturers under its CRS. Module producers can then use this to prove their products conform to Indian standards.

Joerg Althaus, manager, Solar Business, India/Middle East and Africa, TUV Rheinland, said: “TUV Rheinland's state-of-the-art Photovoltaic Laboratory in Bangalore houses advanced equipment to test solar photovoltaic modules, as per BIS CRS. Our lab has one of the largest capacity for BIS testing in India.  We possess the infrastructure and the required competencies to support local as well as international manufacturers in introducing their products to the Indian market.”

Kamalaksha C S, manager, TUV Rheinland Solar Business, India, added: “Our laboratories operate cutting-edge testing equipment to test products accurately and in accordance with the BIS Compulsory Registration Scheme. PV Modules are tested for design qualification according to IS 14286 and for safety requirements according to IS/IEC 61730-1&2. Evaluations include criteria such as electrical, mechanical and fire safety requirements. We have steadily expanded our testing infrastructure that operates 24/7 to cater to multiple projects.”

TUV Rheinland, an independent technical services provider which has been operating in India since 1996, also offers independent engineers and technical advisors for PV investors and developers in the South Asian country.

The inaugural PV IndiaTech 2019 conference, organised by Solar Media, will have its premiere on 24-25 April 2019.

Read Next

February 16, 2026
Axis Energy has signed a memorandum of understanding (MoU) with the Government of Odisha to develop up to 5GW of renewable energy capacity in the state. 
February 13, 2026
Inox Clean Energy has partnered with integrated renewable energy platform RJ Corp to expand into Africa’s renewable energy markets.
Premium
February 13, 2026
PV Talk: Charith Konda, energy specialist at IEEFA, says India’s 2026-27 budget aims to “establish a stronger supply chain within the solar and PV cell and module sector,” but warns that “execution is as important as the policy itself.”
February 13, 2026
Solar PV installations in India have reached a record 36.6GW in 2025, a 43% increase from the previous year’s 25GW.
February 11, 2026
India’s MNREA has released the fourth revision of its ALMM II for solar cells, increasing the total enlisted manufacturing capacity to 26GW. 
February 10, 2026
Rewa Ultra Mega Solar Limited (RUMSL) has extended a Letter of Award (LOA) to Ceigall India and ACME Solar to develop 220MW solar-plus-storage in Morena, Madhya Pradesh. 

Upcoming Events

Upcoming Webinars
February 18, 2026
9am PST / 5pm GMT
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA