India’s first solar-wind hybrid to be retrofitted with storage after year of strong wind

September 19, 2018
Facebook
Twitter
LinkedIn
Reddit
Email

The first ever wind and solar hybrid project in India, completed in April 2018, is to be retrofitted with energy storage after strong winds this year led to a curtailment of solar production.

Speaking to PV Tech at the REI Expo in Greater Noida, Rahul Munjal, chairman of Delhi-headquartered clean energy firm Hero Future Energies, said the plan is to use lithium-ion battery storage technology and the firm is currently in the process of procuring a technology supplier.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Munjal added: “The hybrid plant saw extremely good winds this year and when it saw good winds we had to back down solar because there was a constraint on the capacity we could put on the grid.

“Now to augment that, we feel the right thing to do is rather than waste the energy, store it.”

The second reason for adding a battery is that Hero wants to learn more about the technology by using it on its own plants and the battery will act as a pilot. If the trial goes well, then Hero will consider retrofitting some of its other renewable energy projects with storage in the future.

The hybrid plant is located in the state of Karnataka and PV Tech attended the inauguration in April this year, publishing a lengthy insight on the project. The plant at Kavithal, Raichur District, which included an existing 50MW wind farm, now has a neighbouring 28.8MW solar PV site to form a hybrid system. The project’s evacuation capacity remained at 50MW since the primary aim was to address grid-integration concerns around variable power coming from renewable energy. The off-takers of the power are a number of unnamed private companies also based in Karnataka. 

Back in April, Munjal said he believes that large-scale coupling with energy storage will proliferate in the next two to three years, although price remains a problem for now.

Solar Energy Corporation of India (SECI) recently issued a Request for Selection (RfS) document for 2.5GW of hybrid wind and solar projects to be connected to the Interstate Transmission System (ISTS).

The Ministry of New and Renewable Energy (MNRE) has also issued an amendment to its National Wind-Solar Hybrid Policy, clarifying that any form of energy storage – not just batteries – can be used in hybrid projects.

Read Next

March 20, 2026
Global solar PV installations reached 647GW in 2025, up 11% from the previous year, according to data from think tank Ember.
March 19, 2026
Indian rooftop solar specialist Solarium has moved into PV manufacturing with the commissioning of a 1GW module facility in Gujarat.
March 18, 2026
India added 119GW of solar module and over 9GW of solar cell manufacturing capacity in 2025, according to Mercom’s latest report.
March 18, 2026
Indian PV encapsulant and backsheet manufacturer RenewSys has commissioned a 3GW solar module manufacturing facility in Raigad, Maharashtra.
Premium
March 17, 2026
PV Talk: Premier Energies' Vinay Rustagi explores how India’s rapid renewable energy expansion is colliding with the limitations of its grids.
March 17, 2026
Sunsure has secured INR6.06 billion (US$65.6 million) in debt financing to develop solar projects across Maharashtra and Uttar Pradesh.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain