LG Solar, Vaha Energy develop solar system at Los Angeles Lakers practice facility

Facebook
Twitter
LinkedIn
Reddit
Email
These panels will  generate an estimated 245,000 kWh annually – enough to power 35 homes for a year. Image: LG Energy

The Los Angeles Lakers, LG Electronics USA and Vaha Energy have announced a partnership that will see the NBA team’s new practice facility powered by LG solar panels.

The 120,000 square foot facility serves as both the Lakers' training facility and the home court of the South Bay Lakers.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Vaha Energy installed 456 of the 375W LG NeON 2 solar panels at the site. These panels will  generate an estimated 245,000 kWh annually – enough to power 35 homes for a year – with a projected savings of about US$38,000 per year.

The solar installation is also expected to pay for itself in less than four years, according to Vaha.

Garry Wicka, US head of marketing for LG Solar, noted the Lakers project is as the first professional training facility powered by LG Solar panels.

In order to help serve US customers, LG Energy is developing a new solar module factory in the US. Once completed in early 2019, the new US$28 million plant is expected to produce 500MW of high-performance solar panels annually and create about 160 full-time jobs in the area around Huntsville, Alabama.

Read Next

October 30, 2026
US solar manufacturer First Solar reported net sales of US$1.23 billion for the third quarter of 2026, down 23% year-on-year.
October 30, 2026
US CBP has released solar cell shipments from Japanese manufacturer TOYO’s Ethiopian facility after reviewing its supply chain documentation.
October 30, 2026
Michigan utility DTE Energy has announced the operational status of its 132MW Fish Creek Solar Park near Sheridan, Michigan.
October 30, 2026
SEG Solar has signed a land agreement for a planned US$950 million heterojunction (HJT) solar cell manufacturing facility at its Tomball Industrial Campus near Houston, Texas.
October 29, 2026
Nextpower has reported net income of US$165 million and revenue of over US$1.1 billion in its results for the quarter ending 2 October.
October 29, 2026
First Solar has inaugurated the first 1.7GW phase of its US$330 million manufacturing facility in Gaffney, Cherokee County, South Carolina.

Upcoming Events

Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye