LG Solar, Vaha Energy develop solar system at Los Angeles Lakers practice facility

Facebook
Twitter
LinkedIn
Reddit
Email
These panels will  generate an estimated 245,000 kWh annually – enough to power 35 homes for a year. Image: LG Energy

The Los Angeles Lakers, LG Electronics USA and Vaha Energy have announced a partnership that will see the NBA team’s new practice facility powered by LG solar panels.

The 120,000 square foot facility serves as both the Lakers' training facility and the home court of the South Bay Lakers.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Vaha Energy installed 456 of the 375W LG NeON 2 solar panels at the site. These panels will  generate an estimated 245,000 kWh annually – enough to power 35 homes for a year – with a projected savings of about US$38,000 per year.

The solar installation is also expected to pay for itself in less than four years, according to Vaha.

Garry Wicka, US head of marketing for LG Solar, noted the Lakers project is as the first professional training facility powered by LG Solar panels.

In order to help serve US customers, LG Energy is developing a new solar module factory in the US. Once completed in early 2019, the new US$28 million plant is expected to produce 500MW of high-performance solar panels annually and create about 160 full-time jobs in the area around Huntsville, Alabama.

Read Next

October 23, 2026
New Jersey representative Rob Menendez has introduced the Socket Full of Sunshine Act, the first federal-level bill to support plug-in solar.
October 23, 2026
Deriva Energy has announced the close of approximately US$540 million in financing for its 350MW Sullivan County Power Project.
October 22, 2026
NextEra Energy recorded a 9.7% increase in its net earnings in Q3 2026, with earnings up 9.5% in the nine months to date this year.
October 22, 2026
Kendall Sustainable Infrastructure (KSI) has started operating three community solar projects totalling 15.8MWdc across New York and Oregon.
October 21, 2026
Solar power generation facilities can be exposed to risks from the effects of hailstorms, snow and typhoons, according to kWh Analytics.
October 21, 2026
Pivot Energy has closed a US$500 million bilateral corporate credit facility to further solar PV and BESS deployments.

Upcoming Events

Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye