Ontario eliminates renewables’ domestic content requirement

Facebook
Twitter
LinkedIn
Reddit
Email

The government of Ontario is eliminating the domestic content requirement for renewable energy projects.

Japan and the European Union raised signalled their opposition at the World Trade Organisation (WTO), to Ontario’s 60% domestic content requirement for renewable energy projects to be eligible for the government’s feed-in-tariff (FiT). The requirement is being scrapped altogether.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The amendment in the Ontario Electricity Act, which specified that 60% of a solar or wind project's equipment or services must be locally sourced,  was ruled as unfairly discriminating against outside companies by the WTO. In May the domestic requirement level was reduced to 22% for crystalline and 28% for thin-film PV systems.

Originally a temporary measure to resettle domestic trade, the requirement has been eliminated entirely. The government claims industry growth means it is no longer required.

“The strength of the sector means here at home, when Ontario’s renewable energy providers make decisions about what products and services they purchase, we’re confident Ontario suppliers will be competitive and the supplier of choice,” said Bob Chiarelli, Ontario Minister of Energy.

The amendment means there is no domestic content requirement needed for eligibility to government FiTs. The Ontario government claims this will save ratepayers CA$1.9 billion over 35 years.

Canada has opened a trade case against China over alleged dumping and subsidising of silicon metal from China.

Read Next

October 30, 2026
Norwegian independent power producer (IPP) Scatec has been impacted by an impairment loss from its solar PV plants and intangible assets in Ukraine and Pakistan during its third quarter results for 2026.
Premium
October 30, 2026
Renewabl's JP Cerda speaks to PV Tech Premium about changing corporate procurement strategies and the impact of negative electricity prices.
October 30, 2026
The 200MW FPV project in Malaysia will be one of the largest floating solar developments in Southeast Asia, built using Masdar's experience from 145MW Cirata plant in Indonesia.
October 30, 2026
US solar manufacturer First Solar reported net sales of US$1.23 billion for the third quarter of 2026, down 23% year-on-year.
Premium
October 30, 2026
Ahead of PV ModuleTech Europe, Veronica Bermúdez Benito talks with PV Tech Premium about capex, common PV procurement mistakes and the importance of opex for LCOE.
October 30, 2026
US CBP has released solar cell shipments from Japanese manufacturer TOYO’s Ethiopian facility after reviewing its supply chain documentation.

Upcoming Events

Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye