PROJECT ROUND-UP: Vattenfall’s maiden floating solar farm, Acciona adds to Chilean solar push

Facebook
Twitter
LinkedIn
Reddit
Email
The 1.2MW floating solar farm completed by Vattenfall is built on a body of water created by sand and gravel extraction. Image: Vattenfall.

A round-up of the latest project development news from the solar industry, as Vattenfall completes its maiden floating solar project, Acciona breaks ground on a 238MWp array in Chile and one of the Middle East’s largest bifacial solar projects completes three months early.

 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Vattenfall completes maiden floating solar project

28 September 2020: Swedish state-backed energy giant Vattenfall has completed its first floating solar farm.

The 1.2MW project, first announced late last year, has been completed on behalf of Netterden, a sand and gravel producer in Groningen. It has been developed on a body of water made through sand and gravel extraction, with the electricity generated used to power industrial equipment at the facility.

Vattenfall was responsible for the project’s development as prime contractor, while Netterden financed the project.

“Netterden's vision on socially responsible business was the main reason for launching this project. Green power is a natural part of this. This ambition is an excellent fit with Vattenfall's mission to make fossil-free living possible within one generation. We are pleased to have had the opportunity to make this project feasible for them,” Ivo Iprenburg, business development manager at Vattenfall, said.

 

Acciona breaks ground on 238MWp Chile solar facility

23 September 2020: Acciona has broken ground on a solar project in Chile which, once complete, will have a generation capacity of 238MWp.

The Malgarida complex, formed of two separate arrays, will be Acciona’s seventh renewable energy project in the South American solar hotspot and will take the company’s total installed capacity to just shy of 1GW (922MW) once commissioned next year.

The projects will feature 580,000 modules using horizontal trackers, however Acciona has not confirmed specifically which suppliers would be used.

Malgarida I and II will require a total investment of US$170 million to complete, but will generate 654GWh of electricity each year.

PV Tech uncovered the growing role solar is playing in Chile’s energy transition, detailing why the Latin American nation has emerged as one of global solar’s hottest markets, in a feature which can be read here.

105MW project in Oman races to complete months ahead of schedule

29 September 2020: A 105MW project in the Sultanate of Oman has commenced commercial operations three months ahead of schedule.

The project is among the largest solar arrays operational in the Middle East to use bifacial panels.

Its development was put up for tender by Petroleum Development Oman and built by a consortium including Japan’s Marubeni, with Enertis providing engineering services.

Power produced by the facility is procured by Petroleum Development Oman under a 23-year power purchase agreement.

Read Next

June 1, 2026
Grenergy has signed a 12-year hybrid power purchase agreement (PPA) in Chile linked to the fifth phase of its Oasis de Atacama solar-plus-storage platform.
May 29, 2026
Zelestra has completed the sale of its Latin America platform to Promigas in a deal valued at approximately US$1.1 billion.
Sponsored
May 27, 2026
From next-generation modules to bifacial innovations, Tongwei's booth A2.350 promises to be a destination for anyone serious about solar.
May 18, 2026
Naqaa Sustainable Energy has signed a power purchase agreement (PPA) for a 2.7GW hybrid renewable energy project in Mahout and Duqm, Oman.
May 12, 2026
Spanish IPP Grenergy has secured US$268 million towards a 342MW/1,034MWh solar-plus-storage project in Chile.
May 5, 2026
The Dutch government is planning to introduce a feed-in-tariff that will require large electricity producers to pay towards the cost of the electricity grid.

Upcoming Events

Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil