TÜV Rheinland certifies New-Tek’s solar module assembly plant in Kyrgyzstan

Facebook
Twitter
LinkedIn
Reddit
Email
PV module assembly firm New-Tek in Kyrgyzstan has received TÜV Rheinland certifications related to IEC 61215:2016 and IEC 61730:2016 standards on module reliability. ImageL TUV Rheinland

PV module assembly firm New-Tek in Kyrgyzstan has received TÜV Rheinland certifications related to IEC 61215:2016 and IEC 61730:2016 standards on module reliability. 

New-Tek opened its 50MW module assembly plant at the end of 2016, which was supplied as a turnkey plant by German-based PV equipment specialist, SCHMID Group. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Dr. Eckart Janknecht, Project Manager for photovoltaic module qualifications at TÜV Rheinland said, “These certifications require a large number of intensive tests in our Cologne laboratory, such as mechanical, electrical, climatic and safety tests.

TÜV Rheinland noted that local Kyrgyzstan climate conditions were taken into account when undertaking the range of reliability tests, such as the hot summers and cold winters as well as the daily temperature fluctuations as part of new climate test sequences, according to IEC 61215:2016. 

Aside to the laboratory tests, on-site inspection of the manufacturing was also mandatory for certification, which includes checking that the manufacturer actually produces what has been tested by TÜV Rheinland and whether basic quality monitoring of the photovoltaic modules takes place and whether general quality requirements (based on ISO 9001) are met.

“With the exception of minor deviations that were subsequently corrected, production ran smoothly and the modules passed the tests without any problems,” added Dr. Janknecht.

8 October 2024
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 8-9 October 2024 is our second PV CellTech conference dedicated to the U.S. manufacturing sector. The event in 2023 was a sell out success and 2024 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.
26 November 2024
Málaga, Spain
Understanding PV module supply to the European market in 2025. PV ModuleTech Europe 2024 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of module supplier selection; product availability, technology offerings, traceability of supply-chain, factory auditing, module testing and reliability, and company bankability.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Sydney, Australia