NV Energy issues RfP for ‘major additions’ to its renewables portfolio

Facebook
Twitter
LinkedIn
Reddit
Email
An existing solar farm in Nevada, brought forward by Phoenix Solar. Image: Phoenix Solar.

US utility NV Energy has issued a request for proposals (RfP) for “major additions” to its renewable energy portfolio.

Solar, geothermal, wind, biomass and biogas technology projects compliant with Nevada’s existing renewable portfolio standards are to be considered, however NV Energy said it would also consider proposals for both standalone energy storage systems and generation projects co-located with energy storage. Projects will have a minimum generation capacity of 20MW to be considered.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Bids are to be accepted until a deadline of 6 January 2021, and all projects will require approval from the Public Utilities Commission of Nevada (PUCN).

A final shortlist of projects is to be issued on 22 February 2021, with contract execution slated for late April 2021.

NV Energy said it expected projects to come on stream by 31 December 2025.

The RfP follows NV Energy and a host of other utilities in the US accelerating their deployment of solar, storage and other renewable energies as they look to decarbonise.

NV Energy noted that on top of its new RfP, more than 1.1GW of solar and 590MW of battery storage is to be built in Nevada following PUCN approval for projects following a similar RfP in December last year. Those projects are due to come onstream by 1 January 2024.

Additionally, renewable projects approved by PUCN in December 2018 are now starting to break ground, with 1GW of renewable energy set to begin generating by the end of next year.

“We expect these new projects to provide some of the lowest-cost renewable energy available, which will directly benefit our customers,” Doug Cannon, president and CEO at NV Energy, said.

The latest edition of PV Tech Power – PV Tech’s dedicated downstream solar journal – charted the rise of utility-driven solar and energy storage in a feature length article that explored some of the key drivers behind the sector’s growth. An extract of that article can be read here, while the full article can be read within PV Tech Power Vol. 24, which can be purchased via the PV Tech Store.

13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States.

Read Next

Premium
August 21, 2026
Drawing on his experience of flood risk engineering, Hossein Gheovasi makes the case for early, accurate hydrology in solar project design.
August 21, 2026
US IPP Swift Current Energy has secured a US$750 million credit facility to support what it called “reliable, clean energy projects” in the US.
Premium
August 21, 2026
ES Foundry's Alex Zhu outlines how the US cell maker is betting on PERC while navigating shifting regulations and supply-chain constraints.
Premium
August 21, 2026
PV Tech Premium speaks with United Solar about the challenges of building polysilicon capacity outside of China and catering to the US and Indian markets.
August 20, 2026
This week's PV Chart of the Week looks at trends in the country of origin of companies producing inverters on US soil.
August 20, 2026
PowerBank has reacquired two New York community solar projects totalling 13.9MW, with a combined construction value of US$32.5 million.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye