Polysilicon producer Hemlock suing JA Solar for almost US$1 billion

Facebook
Twitter
LinkedIn
Reddit
Email
Hemlock Semiconductor claimed in court filings that JA Solar did not order or take delivery of any polysilicon under the ‘take or pay’ contract.

Major US-based polysilicon producer Hemlock Semiconductor has filed suit against ‘Silicon Module Super League’ (SMSL) member, JA Solar for breaching a long-term polysilicon supply agreement. 

Filings with the Supreme Court of the State of New York by Hemlock Semiconductor claim that JA Solar made only one (US$10.3 million) instalment of an initial advance payment of US$103 million to secure polysilicon shipments starting in 2011. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Subsequently, Hemlock Semiconductor claimed in court filings that JA Solar did not order or take delivery of any polysilicon under the ‘take or pay’ contract.

The polysilicon producer is seeking damages totalling no less than US$921.1 million from JA Solar.

JA Solar said in an SEC filing confirming the court action, also noting that the company was reviewing the claim and would provide further updates when developments happen. 

Hemlock Semiconductor has previously filed a similar law suit against SolarWorld’s former subsidiary, Deutsche Solar for breaching a ‘take or pay’ contract as well as against Japanese module producer Kyocera. 

Other major PV manufacturers such as Yingli Green Energy and Trina Solar had previously settled with Hemlock over failure to comply with take or pay contracts.

11 March 2025
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

January 31, 2025
JA Solar has unveiled its DeepBlue 5.0 series of modules, its latest n-type tunnel oxide passivated contact (TOPCon) product.
January 29, 2025
The SSI has now reinstated JA Solar’s membership “with immediate effect” after an investigation, in contrast with the US government.
January 27, 2025
REC Silicon has secured a US$40 million term loan from Hanwha International LLC, a subsidiary of Korean conglomerate and REC majority shareholder, Hanwha Solutions.
January 22, 2025
JA said the Ulan Buh Desert Northeast New Energy Base is ultimately planned to be a 12GW solar and wind power hub.
January 21, 2025
Chinese manufacturer JA Solar will supply n-type modules for the 1GW Abydos Phase II solar-plus-storage project in Egypt.
January 20, 2025
Masdar has selected Jinko Solar and JA Solar to supply modules for its 5.2GW solar PV and 19GWh battery storage project in Abu Dhabi.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
February 19, 2025
Tokyo, Japan
Solar Media Events
March 11, 2025
Frankfurt, Germany
Solar Media Events
March 18, 2025
Sydney, Australia