SB Energy inaugurates 900MW Texas PV cluster with Google data centre PPA

October 21, 2024
Facebook
Twitter
LinkedIn
Reddit
Email
SB Energy has has its 418MWp Juno Solar project bsased in Texas. Image: SB Energy.

California-based renewable energy operator SB Energy has started commercial operations at its 900MW Orion I, Orion II and Orion III solar PV projects in Texas, US.

SB said the “Orion Solar Belt”, located in Milam County, northwest of Houston, is expected to qualify for the domestic content bonus credit included under the Inflation Reduction Act (IRA).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The projects comprise over 1.3 million Cadmium Telluride (CdTe) thin-film modules from US manufacturer First Solar, supplied from the company’s manufacturing facility in Perrysburg, Ohio. First Solar has also started developing two other US module manufacturing sites in Alabama and Louisiana. By the time they are completed in 2026, the company said that it intends to have reached 14GW of nameplate production capacity in the US.

Additionally, the Orion Solar Belt includes Nextracker smart solar trackers, with the majority of the components manufactured domestically. SB Energy selected Blattner to provide the project’s engineering, procurement and construction services.

The domestic content bonus adds a 10% tax credit on top of the 30% production tax credit (PTC) already included under the IRA. To qualify, projects must be built with at least 40% “US-made” components, as defined by the Department of Treasury and calculated on a basis of cost. This threshold will rise to 55% next year.

At the project’s launch, US Secretary of Energy Jennifer Granholm, who was present, said the Orion Solar Belt embodies the Biden-Harris Administration’s industrial strategy for clean energy, developed and built by Americans.

“This future is seen in action through the Orion Solar Belt in Texas,” Granholm said, adding: “This project showcases how American-made clean energy can power data centres and our future.”

Orion Solar Belt to supply Google data centres

Readers of PV Tech may be aware that the Orion solar PV projects will supply technology giant Google’s data centres in Ellis County and its Dallas cloud region via a power purchase agreement (PPA) inked in November 2022.

At the time, the PPA was Google’s largest combined clean energy transaction in Texas and remains the technology giant’s largest solar-based energy investment worldwide. The agreement came as part of its professed commitment to operate “every hour of every day” on carbon-free energy by 2030.

Ben Sloss, vice president of 24×7 & capacity at Google, expressed that the company is “thrilled” for the Orion Solar Belt to come online and that it is “helping build a stronger future for communities and Google in Texas”.

Earlier this year, Google announced plans to invest over US$1 billion in Texas. This investment aims to enhance its cloud and data centre infrastructure to meet the increasing demand for Google Cloud services, AI, and other digital products that people and organisations use daily, including Search, Maps, and Workspace.

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2028 and beyond.
13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our third PV CellTech conference dedicated to the U.S. manufacturing sector. The events in 2023, 2024 and 2025 were a sell out success and 2026 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.

Read Next

February 19, 2026
SolarPower Europe has released two new technical due diligence reports for utility-scale hybrid solar PV and battery energy storage system (BESS) projects.
February 19, 2026
Israel-headquartered inverter producer SolarEdge has reported revenue of US$1.1 billion in 2025, while reducing its net loss from the previous year.
February 19, 2026
German solar wafer manufacturer NexWafe and US-based cell producer Talon PV have signed a wafer supply agreement in the US.
February 19, 2026
Swift Current Energy has secured tax equity financing and US$248 million in project financing for its 122MW Three Rivers Solar facility.
February 18, 2026
Meralco PowerGen Corporation has completed initial grid synchronisation and energisation of the 3.5GW MTerra solar project, which includes a 4.5GWh battery energy storage system (BESS). 
February 18, 2026
Octopus Energy has announced an investment of 'nearly' US$1 billion into Californian clean energy, including a solar-plus-storage project.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain