SB Energy inaugurates 900MW Texas PV cluster with Google data centre PPA

Facebook
Twitter
LinkedIn
Reddit
Email
SB Energy has has its 418MWp Juno Solar project bsased in Texas. Image: SB Energy.

California-based renewable energy operator SB Energy has started commercial operations at its 900MW Orion I, Orion II and Orion III solar PV projects in Texas, US.

SB said the “Orion Solar Belt”, located in Milam County, northwest of Houston, is expected to qualify for the domestic content bonus credit included under the Inflation Reduction Act (IRA).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The projects comprise over 1.3 million Cadmium Telluride (CdTe) thin-film modules from US manufacturer First Solar, supplied from the company’s manufacturing facility in Perrysburg, Ohio. First Solar has also started developing two other US module manufacturing sites in Alabama and Louisiana. By the time they are completed in 2026, the company said that it intends to have reached 14GW of nameplate production capacity in the US.

Additionally, the Orion Solar Belt includes Nextracker smart solar trackers, with the majority of the components manufactured domestically. SB Energy selected Blattner to provide the project’s engineering, procurement and construction services.

The domestic content bonus adds a 10% tax credit on top of the 30% production tax credit (PTC) already included under the IRA. To qualify, projects must be built with at least 40% “US-made” components, as defined by the Department of Treasury and calculated on a basis of cost. This threshold will rise to 55% next year.

At the project’s launch, US Secretary of Energy Jennifer Granholm, who was present, said the Orion Solar Belt embodies the Biden-Harris Administration’s industrial strategy for clean energy, developed and built by Americans.

“This future is seen in action through the Orion Solar Belt in Texas,” Granholm said, adding: “This project showcases how American-made clean energy can power data centres and our future.”

Orion Solar Belt to supply Google data centres

Readers of PV Tech may be aware that the Orion solar PV projects will supply technology giant Google’s data centres in Ellis County and its Dallas cloud region via a power purchase agreement (PPA) inked in November 2022.

At the time, the PPA was Google’s largest combined clean energy transaction in Texas and remains the technology giant’s largest solar-based energy investment worldwide. The agreement came as part of its professed commitment to operate “every hour of every day” on carbon-free energy by 2030.

Ben Sloss, vice president of 24×7 & capacity at Google, expressed that the company is “thrilled” for the Orion Solar Belt to come online and that it is “helping build a stronger future for communities and Google in Texas”.

Earlier this year, Google announced plans to invest over US$1 billion in Texas. This investment aims to enhance its cloud and data centre infrastructure to meet the increasing demand for Google Cloud services, AI, and other digital products that people and organisations use daily, including Search, Maps, and Workspace.

13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States.

Read Next

September 22, 2026
US renewable energy developer NorthStar Clean Energy has completed construction of a 120MW solar PV project in Oceana County, Michigan.
September 22, 2026
Austrian renewable energy company Kelag International has acquired a 64.4MWp portfolio of agrivoltaics projects in Italy.
September 22, 2026
Ingka Investments has started commercial operations at a 74.9MWac solar PV project in the US state of South Carolina.
September 22, 2026
US solar cell manufacturer ES Foundry is joining a research initiative led by the Massachusetts Institute of Technology focused on strengthening US manufacturing.
September 21, 2026
A Rhode Island judge ruled the EPA unlawfully terminated the US$7 billion Solar for All programme, designed to expand solar access.
September 21, 2026
Dilip Buildcon agrees to divest its stake in 10 SPVs developing a 1.36GWac solar portfolio in Madhya Pradesh.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye