The conflict of agricultural land use for solar power plants could be a thing of the past after a science driven agrophotovoltaics (APV) pilot project near Lake Constance in Germany, led by Fraunhofer ISE has proved the viability of dual land use.
Building Energy celebrated the outset of production for a 10MWp capacity solar plant in Tororo town, its first PV system in Uganda and one of the largest solar plants in East Africa.
DNV GL has launched the first control hardware in loop (CHIL) test facility for renewable energy generation plants. The facility connects physical power plant controllers to a real-time simulator, allowing the controller to be fully tested and validated without the need for an actual generation facility or power grid. This enables cost-effective, low-risk testing under realistic conditions for all forms of renewable energy control systems.
German-based PV module manufacturer Heckert Solar GmbH said that it had been one of the pioneers using Fraunhofer ISE’s new software that helps reduce cell-to-module losses that have led to module performance gains.
UK-headquartered multicrystalline solar wafer producer PV Crystalox Solar continues to be impacted by global overcapacity in the wafering sector as first half 2017 financial results reflect.
Automotive giant Audi AG and thin-film solar manufacturer Hanergy, via its US-based subsidiary Alta Devices have signed an MOU in respect of a development agreement to provide its electric vehicles with gallium arsenide (GaAs) flexible thin film based solar system integrated into a range of planned electric vehicles.
Newly formed German PV module manufacture SolarWorld Industries GmbH has officially started production, according to the insolvency administrator for SolarWorld AG.
The insolvency administrator for SolarWorld AG's shares in Solarparc GmbH, Deutsche Lithium GmbH and SolarWorld Americas said it was focusing its efforts on finding buyers for these companies.
German gas and power company Gasag announced that it is investing around US$37.7 million over the next two to three years for a portfolio of PV projects totaling 40MW.