China-based module assembly automation specialist Suzhou Horad New Energy Equipment Co (Horad) has secured a new 500MW automated turnkey module line order from Xinneng Solar.
Xinneng Solar was said to be located in Zhejiang Province, China. Further details were not disclosed.
This article requires Premium SubscriptionBasic (FREE) Subscription
Unlock unlimited access for 12 whole months of distinctive global analysis
Photovoltaics International is now included.
- Regular insight and analysis of the industry’s biggest developments
- In-depth interviews with the industry’s leading figures
- Unlimited digital access to the PV Tech Power journal catalogue
- Unlimited digital access to the Photovoltaics International journal catalogue
- Access to more than 1,000 technical papers
- Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
Horad recently secured a 200MW turnkey module assembly line order with major Taiwanese cell producer, Motech Industries.