3S delivers its first semi-automatic production line to Eurener Energia Solar

Facebook
Twitter
LinkedIn
Reddit
Email

Eights months after 3S Swiss Solar Systems first entered into business with semi-automatic production lines, it has delivered its first line to the Alicante-based Eurener Energia Solar, which had previously been operating with the manual 3S production line since 2006. Eurener has installed a semi-automatic 20MW line, which includes an automatic string soldering station from Somont, a laminating line from 3S and a module tester from Pasan.

“The new line is completely tailored to the specific needs of our customer”, said CEO Patrick Hofer-Noser. “We plan and build our production lines in such a way that the module producers obtain the optimal degree of automation for their needs.”

3S Swiss Solar Systems has had its semi-automatic production line in operation since March 2008 at its technical centre in Lyss, Switzerland, which serves as a test facility for customers and as a training line.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
April 10, 2024
Dallas, Texas USA
Solar Media Events
April 17, 2024
Lisbon, Portugal
Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Napa, USA