
Azure Power, one of India’s largest independent power producers, has commissioned a 100MW solar park in Andhra Pradesh that was auctioned by NTPC.
Azure Power will supply power to India’s largest utility for 25 years at a tariff of INR 5.12/kWh (US$ 7.9 cents/kWh).
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
Construction began on the project in December 2016, which was brought online on schedule.
The plant is located on more than 200 hectares in Kurnool Ultra Mega Solar Park and is being developed by the Solar Park Implementation Agency (SPIA) and Andhra Pradesh Solar Power Corporation.
“With the commissioning of this plant, we have once again demonstrated our strong project development, engineering, and execution capabilities,” said Inderpreet Wadhwa, Azure Power founder and CEO. “We are delighted to make a contribution towards realization of our Honourable prime minister’s commitment towards clean and green energy, through solar power generation. Our sincere gratitude to NTPC and the State of Andhra Pradesh for all the cooperation and support extended.”