
India-based renewable energy developer Azure Power has commissioned a 40MW solar PV project in the state of Uttar Pradesh.
The plant is spread across an area of approximately 91 hectares and was built under the government’s National Solar Mission Phase II Batch III Tranche III, having been awarded in an auction by Solar Energy Corporation of India (SECI).
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
Azure Power will supply power to SECI for the next 25 years at a levelized tariff of INR4.92/kWh (~US$7.7 cents), which is inclusive of Viability Gap Funding (VGF).
Inderpreet Wadhwa, founder, chairman and chief executive, Azure Power said: “With the commissioning of this plant, we have once again demonstrated our strong project development, engineering, and execution capabilities. We are delighted to make a contribution towards the realization of our Hon’ble Prime Minister’s commitment towards clean and green energy, through solar power generation. Our sincere gratitude to SECI and the state of Uttar Pradesh for all the cooperation and support extended.”