Azure Power commissions 40MW solar project in Uttar Pradesh

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: Azure Power

India-based renewable energy developer Azure Power has commissioned a 40MW solar PV project in the state of Uttar Pradesh.

The plant is spread across an area of approximately 91 hectares and was built under the government’s National Solar Mission Phase II Batch III Tranche III, having been awarded in an auction by Solar Energy Corporation of India (SECI).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Azure Power will supply power to SECI for the next 25 years at a levelized tariff of INR4.92/kWh (~US$7.7 cents), which is inclusive of Viability Gap Funding (VGF).

Inderpreet Wadhwa, founder, chairman and chief executive, Azure Power said: “With the commissioning of this plant, we have once again demonstrated our strong project development, engineering, and execution capabilities. We are delighted to make a contribution towards the realization of our Hon’ble Prime Minister’s commitment towards clean and green energy, through solar power generation. Our sincere gratitude to SECI and the state of Uttar Pradesh for all the cooperation and support extended.”

Read Next

July 10, 2026
The financing will support the Government of India’s PM Surya Ghar: Muft Bijli Yojana (PMSMGBY) initiative.
July 10, 2026
Australia and India have formalised a broadened energy partnership that spans renewable energy deployment, supply chain resilience, critical minerals, rooftop solar training and uranium exports.
July 9, 2026
India added approximately 26GW of solar capacity and 3GW of wind capacity during the first half of 2026, according to JMK Research. 
July 9, 2026
Premier Energies expects to begin construction of the first phase of its planned 10GW ingot and wafer manufacturing facility in Andhra Pradesh shortly.
July 9, 2026
India's power transmission sector is set for a multi-year investment cycle between FY2027 and FY2032, according to ICRA.
July 6, 2026
Vikram Solar has commissioned its new solar module manufacturing facility at Gangaikondan in the southern state of Tamil Nadu.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
April 20, 2027
Istanbul, Türkiye