First Solar inaugurates ‘AI-powered’ 3.5GW Louisiana factory

Facebook
Twitter
LinkedIn
Reddit
Email
The US$1.1 billion facility in Iberia Parish, Louisiana, produced its first modules in July 2025. Image: First Solar

US solar module manufacturer First Solar has inaugurated its 3.5GW vertically integrated manufacturing facility in the state of Louisiana, the company’s fifth factory in the US.

The US$1.1 billion facility in Iberia Parish, Louisiana, produced its first PV modules in July 2025, “several months ahead of schedule,” according to First Solar, which it attributed to the protectionist trade and industrial policies implemented by the Trump administration.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Once fully ramped in 2026, the new facility will bring First Solar’s US nameplate cadmium telluride (CdTe) thin-film module manufacturing capacity to 14GW.

First Solar produces its Series 7 modules at the site using US-made glass and steel. Production processes at the site are supported by “high-tech” artificial intelligence (AI), using “computer vision and deep learning to automatically detect defects in solar panels during production,“ First Solar said.

“This is, beyond doubt, one of the most advanced solar manufacturing facilities in the world and it represents the very best of American manufacturing innovation,” said Kuntal Kumar Verma, chief manufacturing officer, First Solar. 

The company operates three manufacturing facilities in Ohio, one in Alabama and research & development (R&D) centres in Ohio and California. Last week, it confirmed that it would build another 3.7GW thin-film PV module assembly facility in South Carolina next year to complete “final assembly” of Series 6 modules produced at its international facilities.

First Solar has made a flurry of announcement and deals since the US budget reconciliation bill – the “One, Big, Beautiful Bill” (OBBB) – which put greater restrictions on the use of materials from “foreign entities of concern” (FEOC) and reduced federal tax incentives for solar developments.

By producing CdTe thin-film modules, First Solar is removed from the China-dominated silicon supply chain, which exposes most US solar manufacturers to FEOC restrictions. The company said it expects its products to be fully FEOC-compliant.

CEO Mark Widmar has previously said that the Trump administration’s policies “strengthen” First Solar’s position, even as analysts forecast that the market will significantly contract and condemn “politicised” attacks on renewables.  

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2028 and beyond.
13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States.

Read Next

June 1, 2026
Nextpower has filed a patent lawsuit against GameChange Energy on the same day GameChange announced a strategic consolidation of its activities and rebrand.
June 1, 2026
SEG Solar will build a third module manufacturing plant in the US that will bring the company’s total manufacturing capacity to 10.6GW.
June 1, 2026
EDF power solutions North America has signed a 30-year PPA to sell power generated at the 400MW Utah Solar 1 Energy project to the LADWP.
June 1, 2026
US IPP Matrix Renewables and EPC contractor SOLV Energy have commenced construction on the Tormes Solar Project, a 457MWdc facility in Navarro County, Texas.
June 1, 2026
New York State's 2027 fiscal year budget has allocated US$200 million for rooftop and community solar, unlocking 1GW of new PV.
June 1, 2026
The ESMC has joined 22 other European industry bodies in signing an open letter, calling for greater protection from 'unfair trade practices'.

Upcoming Events

Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil