Germany launches new tender for 1.95GW of solar PV

Facebook
Twitter
LinkedIn
Reddit
Email
The latest solar tender in Germany will allocate a third of the total capacity (5.85GW) to be awarded in 2023. Image: EnBW.

Germany has launched a new tender which seeks to add 1.95GW of utility-scale solar PV capacity on arable land and grassland in disadvantaged areas.

The deadline for the bids has been set to 1 March 2023 and will have a maximum price bidding set at €0.0737/kWh (US$0.08/kWh), which was increased earlier this week.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Bids for this tender will be applicable on arable land and grassland in disadvantaged areas, with each region allocating a maximum quota for it, ranging from a maximum of 500MW solar capacity in the federal state of Baden-Wuerttemberg to Hesse’s 35MW.

With this latest solar auction, Germany will allocate a third of the total capacity (5.85GW) to be awarded throughout auctions this year.

Ahead of the new tender, the German Federal Network Agency increased the price cap for ground-mounted solar tenders in an attempt to attract more interest in the auction as the latest one for solar ended up being undersubscribed.

In a similar move, Germany also raised the price cap for rooftop solar tenders, with a similar expectation to increase the number of bids for its solar tenders it will hold in 2023.

The results for the December tender ended up awarding 609MW of solar capacity out of 677MW of applications sent, despite a 890MW tender offer for utility-scale solar, due to the price cap not being adjusted accordingly at the time.

Germany was not the only European country to end up having an undersubscribed solar tender last year, with Spain’s latest auction awarding no capacity to solar PV, while Poland and Italy awarded less capacity than previous tenders.

Moreover, Germany received approval from the European Commission for its near-US$30 billion renewable scheme that will run until the end of 2026 and which included the increase of tenders, number and volume-wise, for rooftop and ground-mounted solar PV.

Read Next

April 28, 2025
Fraunhofer ISE has developed a solar cell which uses “one-tenth” of the amount of silver as a standard cell.
April 28, 2025
The German Federal Network Agency, the Bundesnetzagentur, has launched the country’s latest rooftop solar PV, seeking 282MW.
April 24, 2025
Swiss solar manufacturer Meyer Burger has reduced shifts for around 300 employees at its Thalheim cell manufacturing facility amid supply chain challenges.
April 23, 2025
Germany’s latest public auction for ground-mounted solar PV capacity ended “significantly oversubscribed”, according to the German electricity regulator, the Bundesnetzagentur.
April 22, 2025
Colombian energy supplier Celsia has acquired a 375MW solar PV portfolio in Colombia from renewables developer Mainstream Renewable Power.
April 10, 2025
Germany's proposal to allow international carbon credits to reach EU decarbonisation targets “risks undermining the target’s credibility”, according to think tank Agora.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
May 7, 2025
Munich, Germany
Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK