Azure Power commissions 100MW solar project in Telangana

Facebook
Twitter
LinkedIn
Reddit
Email
Azure Power will also supply power to NTPC for the next 25 years at a tariff of US$0.07 per kWh. Image: Azure Power

Indian developer Azure Power has commissioned a 100MW PV plant in the state of Telangana.

The installation, developed over 202 hectares of land, has been set up under the National Solar Mission Phase II, Batch II, Tranche I. The project was auctioned by Indian utility NTPC and Azure will also supply power to NTPC for the next 25 years at a tariff of INR4.67/kWh (US$0.07).

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Inderpreet Wadhwa, founder, chairman and chief executive officer, Azure Power, said: “Telangana’s continued reliance and faith in solar energy has successfully transformed it into one of the largest solar power producing states in the country.

Azure recently won a 200MW solar project at the Bhadla Solar Park in Rajasthan through an auction conducted by Solar Energy Corporation of India (SECI). Azure will sign a 25-year power purchase agreement with SECI at a tariff of INR2.48/kWh (US$0.04).

Read Next

July 17, 2025
Indian solar manufacturers are among the targets of a new petition filed by US producers alleging illegal trade practices by overseas firms.
July 15, 2025
Indian renewable energy company SAEL Industries is developing a 5GW solar cell and 5GW module manufacturing facility in Greater Noida, Uttar Pradesh.
July 11, 2025
Indian independent power producer (IPP) Juniper Green Energy has commissioned an additional 71MWp at Chapalgaon Solar Project in Solapur, Maharashtra.
July 9, 2025
Indian solar water pump and motor manufacturer Shakti Pumps has successfully raised INR2.9 billion (US$34.1 million) to build a solar cell and module manufacturing plant.
July 8, 2025
German solar glass manufacturer Glasmanufaktur Brandenburg (GMB) has filed for insolvency after posting monthly losses of €900,000 this year.
July 8, 2025
Energy consultancy JMK Research has forecast 28.3GW of utility-scale and residential solar PV to be installed in India during fiscal year 2026.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 22, 2025
Bilbao, Spain
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK