China confirms 110GW goal, drops distributed solar target

Facebook
Twitter
LinkedIn
Reddit
Email
The latest plan endorses the proposed target of 110GW by 2020.

China has released its latest five-year plan for the solar industry with a focus on tackling curtailment, improving project quality and further reducing its feed-in tariff.

The latest plan endorses the proposed target of 110GW by 2020 that had previously been released for consultation by the country’s National Energy Administration (NEA). The government has ceased to include a separate, specific target for distributed generation (DG) projects, in an apparent change of tactics. Concentrated solar power (CSP) will represent 5GW of this figure.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Grid pressures have forced the curtailment of production from some sites with western provinces impacted particularly heavily. Under the new five-year plan, 11 provinces, largely but not exclusively in the east, have been assigned preferential status for solar deployment.

The 110GW figure is a 20% reduction on the original 150GW target. Frank Haugwitz is a Beijing-based expert on PV and renewable energy in China and founder of the Asia Europe Clean Energy Advisory (AECEA). He maintains that the 110GW figure is likely a low bar to be cleared rather than a high, aspirational target. Previous targets have been far-exceeded, Haugwitz has noted.

In what AECEA referred to as a “surprise” announcement, a carve-out in that target for DG installs has been abandoned. Beijing continues to support DG projects and a network of DG energy demonstration zones will be established with a target to install solar on 50% of all rooftops and 80% of new buildings.

10 March 2026
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

June 24, 2025
Chinese solar manufacturing giant LONGi has signed an agreement with Indonesia’s Pertamina New & Renewable Energy to build a 1.4GW module assembly plant in West Java, Indonesia.
June 24, 2025
The Chinese polysilicon industry could face a shortage by 2028, despite persistent overcapacity in recent years, according to polysilicon market analyst Bernreuter Research.
June 23, 2025
China notched up close to 100GW of new PV in May, in the processes surpassing a terawatt of cumulative installed capacity, figures show.
June 19, 2025
The China Enterprise Bankruptcy and Reorganization Case Information Network has published a notice regarding creditor claims for Suntech.
June 18, 2025
Founder Group has signed a US$220 million memorandum of understanding (MOU) with Chinese polysilicon producer GCL Technology.
June 16, 2025
The global solar tracker market expanded by 20% in 2024 to a record size, according to energy research firm Wood Mackenzie.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
July 2, 2025
Bangkok, Thailand
Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 22, 2025
Bilbao, Spain
Solar Media Events
September 30, 2025
Seattle, USA