Gamesa secures 20MW solar project in Sri Lanka

Facebook
Twitter
LinkedIn
Reddit
Email
Flickr: Andrew from Sydney

Spain-based wind specialist Gamesa has secured a contract to develop a 20MW solar plant in Sri Lanka from local industrial conglomerate Laugfs Power.

Gamesa will manufacture and supply PV inverters as well as performing engineering and design for the project located in the province of Hambantota, in south Sri Lanka. Gamesa is already an established wind developer on the South Asian island.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The installation is expected to be complete by October this year.

Gamesa currently has 60MW of PV under construction in India, 12MW of which is in the state of Tamil Nadu. The firm has also already commissioned 16MW of PV projects as part of its 2015/17 plans to explore opportunities that compliment the wind industry, which include solar energy.

India’s ambitious solar energy targets have seen a number of wind specialists move into the solar space of late.

Read Next

July 23, 2026
US perovskite solar technology company Caelux has signed two agreements with Indian solar manufacturers to produce perovskite-silicon “Hybrid Tandem” modules.
July 22, 2026
MNRE's eighth ALMM List-II revision expands Fujiyama Power's PV cell capacity and adds Avaada Electro as a new entrant.
Premium
July 21, 2026
'Home market strength plus Middle Eastern demand' has driven a surge in solar PV capacity in India, according to RenewAtlas and Wiki-Solar.
July 20, 2026
India's renewable energy ministry has extended the exemption from the ALMM List-II on PV cells for net-metering and open-access solar projects until the end of December 2026.
July 16, 2026
Alpex Solar expects commercial production to begin in August 2026 at its 2.2 GW TOPCon G12R solar cell facility in Kosi Kotwan, Mathura, UP.
July 15, 2026
Bluebird Solar has secured a 439.35 MW order from Indian state-owned power producer NTPC Renewable Energy Limited (NTPC REL).

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
April 20, 2027
Istanbul, Türkiye