India targets 10GW solar and wind hybrid capacity by 2022

Facebook
Twitter
LinkedIn
Reddit
Email
raft wind-solar hybrid policy announces India surpassed 7.6GW of solar in May. Credit: Eni

India’s Ministry of New and Renewable Energy (MNRE) has released a draft national Wind-Solar Hybrid Policy targeting 10GW by 2022.

The country has already crossed a mark 26.8GW of wind and 7.6GW of solar power installed capacity during May 2016, according to the draft.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

MNRE has now invited comments from stakeholders on the wind-solar hybrid draft, with a deadline on 30 June. The plans come after studies revealed how wind and solar projects can complement each other by minimizing the variability of the power output and easing pressure on the grid. The policy aims to encourage new technologies and methodologies for such hybrid systems.

The draft noted: “Suitable policy interventions are required not only for new wind-solar hybrid plants but also for encouraging hybridization of existing wind and solar plants.”

The policy goes on to explain various options regarding AC and DC power outputs and how to combine both wind and solar plants.

Developers of new wind-solar hybrid projects will have the option to use the hybrid power for captive use or third party sale or may sell the hybrid power to the local distribution company.

All the financial incentives currently available to wind and solar projects will still be applicable to hybrid projects. Meanwhile, low cost financing for hybrid projects may be made available through the Indian Renewable Energy Development Agency (IREDA) and other financial institutions including multilateral banks.

The news comes the same day that the MNRE announced a scheme to set up 1GW of wind power connected to transmission network of Central Transmission Utility (CTU). Part of the plan is to supply power to non-windy states through a bidding process.

India’s well-touted overall targets are for 100GW of solar and 60GW of wind by 2022.

MNRE also recently invited comments from stakeholders on its draft ‘National Policy for Renewable Energy based Micro and Mini Grids’.

Read Next

September 15, 2025
Norwegian energy firm Statkraft has agreed to divest a portion of its renewable energy portfolio to Serentica Renewables.
September 15, 2025
Vikram Solar has secured a contract to supply 200MW of modules to AB Energia, a domestic solar engineering, procurement, and construction (EPC) solutions provider. 
September 12, 2025
ACME Venus Urja has secured INR3.8 billion (US$43 million) to develop and construct a solar-plus-storage project in Barmer, Rajasthan.
September 10, 2025
Indian solar module manufacturer Vikram Solar reported a 79.7% year-on-year increase in revenue for the first quarter of FY26.
September 8, 2025
Vikram Solar has won a 336MW module supply agreement from L&T Construction for the 2.3GW Khavda solar park in Gujarat. 
September 4, 2025
India’s Goods and Services Tax (GST) Council, the joint forum of the Centre and States, has reduced the GST rate on renewable energy components from 12% to 5%. 

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK
Solar Media Events
October 7, 2025
Manila, Philippines