India targets 10GW solar and wind hybrid capacity by 2022

Facebook
Twitter
LinkedIn
Reddit
Email
raft wind-solar hybrid policy announces India surpassed 7.6GW of solar in May. Credit: Eni

India’s Ministry of New and Renewable Energy (MNRE) has released a draft national Wind-Solar Hybrid Policy targeting 10GW by 2022.

The country has already crossed a mark 26.8GW of wind and 7.6GW of solar power installed capacity during May 2016, according to the draft.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

MNRE has now invited comments from stakeholders on the wind-solar hybrid draft, with a deadline on 30 June. The plans come after studies revealed how wind and solar projects can complement each other by minimizing the variability of the power output and easing pressure on the grid. The policy aims to encourage new technologies and methodologies for such hybrid systems.

The draft noted: “Suitable policy interventions are required not only for new wind-solar hybrid plants but also for encouraging hybridization of existing wind and solar plants.”

The policy goes on to explain various options regarding AC and DC power outputs and how to combine both wind and solar plants.

Developers of new wind-solar hybrid projects will have the option to use the hybrid power for captive use or third party sale or may sell the hybrid power to the local distribution company.

All the financial incentives currently available to wind and solar projects will still be applicable to hybrid projects. Meanwhile, low cost financing for hybrid projects may be made available through the Indian Renewable Energy Development Agency (IREDA) and other financial institutions including multilateral banks.

The news comes the same day that the MNRE announced a scheme to set up 1GW of wind power connected to transmission network of Central Transmission Utility (CTU). Part of the plan is to supply power to non-windy states through a bidding process.

India’s well-touted overall targets are for 100GW of solar and 60GW of wind by 2022.

MNRE also recently invited comments from stakeholders on its draft ‘National Policy for Renewable Energy based Micro and Mini Grids’.

Read Next

June 17, 2026
Navitas announced investment, Bondada secured EPC contract, SolarSquare raised US$53 million, Gujarat Inject and Waaree won module orders.
June 16, 2026
Brisbane-based developer Renewable Energy Partners (REP) has expanded the Bogunda Energy Hub to include solar PV and battery energy storage, with the project now formally in early-stage development south of Hughenden in Queensland, Australia.
June 15, 2026
HVR Solar has signed a series of agreements to develop of a 1.2GW TOPCon solar cell manufacturing plant in Amroha, Uttar Pradesh. 
June 15, 2026
SECI is inviting bids for 4,800MWh of firm and dispatchable renewable energy capacity supported by co-located energy storage systems. 
Premium
June 12, 2026
PV Talk: IEEFA’s Gaurav Upadhyay says India’s rooftop solar surged but conversion gaps and financing barriers persist despite strong momentum.
June 12, 2026
Lu Chuan, chairman of CHINT and its subsidiary Astronergy, outlines his prudent approach to navigating the difficulties facing China's PV manufacturers.

Upcoming Events

Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Solar Media Events
September 9, 2026
Schaumburg, Illinois
Media Partners, Solar Media Events
September 9, 2026