Indian solar tenders ramp up with another 950MW in Karnataka and Andhra Pradesh

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: SECI

Solar Energy Corporation of India (SECI) has tendered another 950MW of solar in Karnataka and Andhra Pradesh.

The Request for Selection (RfS) for 750MW of PV at the Kadapa Solar Park in Andhra Pradesh, comes under NSM Phase II, Batch IV, Tranche XV. There are three 250MW projects on offer.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The Request for Selection (RfS) for 200MW of PV at Pavagada Solar Park, Karnataka, comes under NSM Phase II, Batch IV, Tranche XIV. There are four projects of 50MW capacity each up for grabs.

Projects from both tenders will be set up on a Build Own Operate (BOO) basis.

Earlier in the day, SECI also tendered 275MW of solar in Uttar Pradesh. The Ministry of New and Renewable Energy (MNRE) is now making great strides in its efforts to tender 17GW between the short period of November 2017 and March this year.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
March 19, 2024
Texas, USA
Solar Media Events
March 26, 2024
Lisbon, Portugal
Solar Media Events
April 10, 2024
Dallas, Texas USA