STI Norland bags Brazilian solar tracker deal

Facebook
Twitter
LinkedIn
Reddit
Email
An existing project in Brazil using STI Norland's dual-row trackers. Image: STI Norland.

STI Norland has secured a deal to supply 474MWp-worth of trackers to a project in Brazil which, once complete, will be among the largest in Latin America.

The tracker and mounting system manufacturer will supply the equipment to developer Essentia Energia, which is constructing the Sol do Sertão project in Oliveira dos Brejinhos in Bahia, Brazil.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The firm’s dual-row trackers will be used on the project, which is aimed at completion in H2 2021.

That project will use more than one million bifacial panels supplied by Solar Module Super League (SMSL) member LONGi.

Javier Reclusa, chief executive at STI Norland Brasil, said the deal “solidifies” the company’s position in the Latin American market, describing its partnership with Essentia Energia as one of “great importance for STI Norland”.

The deal was struck just as Brazil’s national solar trade association Absolar revealed that the country’s installed solar capacity exceeded 6GW, made up of around 3.1GW of distributed generation and 2.9GW of utility-scale solar.

That figure is anticipated to soar in the coming years, with Brazil’s controversial president Jair Bolsonaro in June signing a new decree to utilise new green bonds to finance up to 8GW of new solar capacity country-wide.

However the ongoing COVID-19 pandemic has beset Brazil’s plans to become a hotbed of solar activity. In March this year Bolsonaro’s government indefinitely postponed two tenders – the renewables-only A-4 and open bidding A-6 auctions – citing the crisis’ onset.  

Read Next

Premium
June 26, 2025
Carlos Rodriguez, Oktoviano Gandhi and Sun Huixuan examine the energy yield performance of different FPV system configurations.
June 26, 2025
Nextracker will supply solar tracker systems to a 550MW solar PV project in the Greek province of Western Macedonia, owned by Greek renewables developer PPC Renewables.
June 25, 2025
Australia’s National Electricity Market (NEM) achieved a new record high for solar PV and wind generation at 12,463MW.
June 24, 2025
Chinese solar manufacturing giant LONGi has signed an agreement with Indonesia’s Pertamina New & Renewable Energy to build a 1.4GW module assembly plant in West Java, Indonesia.
June 24, 2025
US solar tracker manufacturer GameChange Solar has signed a deal to supply trackers to 715MWp worth of solar PV capacity across South America.
June 18, 2025
US solar tracker manufacturer Array Technologies has acquired APA Solar, a producer of foundations and fixed-tilt racking for solar projects.

Subscribe to Newsletter

Upcoming Events

Upcoming Webinars
June 30, 2025
10am PST / 6pm BST
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Media Partners, Solar Media Events
July 2, 2025
Bangkok, Thailand
Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico