LG launches its first AC module with integrated microinverter to simplify installations

July 12, 2017
Facebook
Twitter
LinkedIn
Reddit
Email
LG Electronics USA has launched the ‘NeON’ 2 ACe module in collaboration with Enphase Energy at Intersolar NA 2017.

LG Electronics USA has launched the ‘NeON’ 2 ACe module in collaboration with Enphase Energy at Intersolar NA 2017. The high-efficiency AC module uses Enphase’s latest IQ6 microinverter technology, which integrated at the module assembly stage is designed to reduce installation time by half, compared with conventional modules, while offering cutting-edge technology.

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Notably in the US, residential PV installation ‘soft costs’ have remained relatively high compared to many other regions. Recent market analysis by GTM Research has also highlighted ‘customer capture’ costs on a cost per-watt basis are set to rise. This puts increased pressure on reducing installation costs. Recent rapid-shutdown (NEC 2014) compliance can also increase the BOS (Balance of System) costs with the addition of rapid-shutdown devices and increased cabling. 

Solution

LG NeON 2 ACe brings together high-performance and a simplified user experience, combining the processes of logistics, installation and monitoring. Installation, always a concern for homeowners, becomes a quick, two-step roof installation process with this integrated AC Module – lifting the microinverter out of the flat shipping position and connecting the cable without the need to install the two products separately and eliminates unnecessary components like extra wiring and bypass diodes. Higher reliability can be achieved due to the microinverter being pre-tested and integrated onto the module at the manufacturing assembly stage. On the surface, LG NeON 2 ACe utilizes brand new cello technology, which replaces the industry standard three busbars with 30 thin wires, enhancing output and reliability. This market-leading technology allows for more energy-efficiency and premium temperature performance characteristics. Aesthetically, these innovations are designed to improve curb-appeal for the homeowner, creating a sleek, black look. A strategically positioned 15mm distance separates the DC module and the microinverter, mitigating any impact to performance and reliability by allowing sufficient air-flow for cooling.

Applications

Residential rooftop.

Platform

LG NeON 2 ACe also comes equip with LG Electronics' 12-year unit warranty and a 25-year warranty for the microinverter. The anodized aluminum frame of the panel can endure a front load up to 6,000Pa and a rear load up to 5,400Pa.

Availability

July 2017, onwards.

Read Next

November 5, 2025
IPP Sol Systems has selected Solv Energy as the EPC services provider for a 209MW solar PV plant in Texas, US. 
Sponsored
November 5, 2025
PV Tech spoke with Symons Xie, general manager of Anker SOLIX APAC, at All-Energy Australia 2025, where the organisation outlined its strategy for establishing a major presence in Australia's rapidly growing home battery and energy storage market.
November 3, 2025
Dr KT Tan, CTO at Viridian Solar, chronicles how the expansion of solar raises questions about supply chain transparency and ethical sourcing.
October 30, 2025
US microinverter producer Enphase Energy posted increased revenues, margin and income in Q3 2025, as it doubles down on its US manufacturing operations.
October 28, 2025
GoldenPeaks Capital secures EUR114 million (US$132 million) financing package for two solar PV Portfolio in Poland.
October 27, 2025
Waaree Energies has secured four solar module supply contracts totalling 692MW – three for projects in India and one in the US through its subsidiary.

Subscribe to Newsletter

Upcoming Events

Upcoming Webinars
November 12, 2025
10am PST / 1pm EST
Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 10, 2026
Frankfurt, Germany