Saudi Arabia approves net metering framework for systems up to 2MW

Facebook
Twitter
LinkedIn
Reddit
Email

Saudi Arabia’s Electricity and Cogeneration Regulatory Authority (ECRA) has approved a net metering scheme that will allow self-consumption and export to the grid.

Eligible PV systems up to 2MW in size will have exported power offset against consumption with a cash pay off for any differential. The rules will come into force from July 2018.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

An earlier draft of the regaltions had set a maximum system size of 1MW, a minimum of 1kW and an aggregate quota of 5MW in any single electrical distribution area, or 3% of that area’s peak load.

As the country looks to diversify its economy and maximise oil revenues that have been slashed by falling global prices, electricity prices have been raised by the state power provider. Sharper tariffs have helped boost the attractiveness of smaller PV systems.

Pre-qualified, registered installers must carry out the work in order for the system to be eligible. 

Read Next

June 3, 2025
GameChange Solar has announced plans to double the capacity of its Saudi Arabia tracker component manufacturing facility to 6GW.
June 2, 2025
A new manufacturing method has produced tandem perovskite-silicon tandem solar cells with a conversion efficiency of 27.8%.
June 2, 2025
The US Department of Energy has downsized a loan to US residential solar installer Sunnova from an initial US$3 billion to US$371.6 million.
May 27, 2025
China has installed a record of 104.9GW of solar PV between January and April 2025, according to data from the Chinese National Energy Administration. 
May 23, 2025
The California State Assembly’s Appropriations Committee has passed a net metering bill that could worsen residential solar owners’ rates when acquiring a property.
May 20, 2025
Third-party ownership (TPO) of non-residential projects in the US has led commercial and industrial (C&I) and community solar financing in 2024.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
June 17, 2025
Napa, USA
Upcoming Webinars
June 30, 2025
10am PST / 6pm BST
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
September 16, 2025
Athens, Greece