SECI readies 2GW local content solar tender for public sector

March 6, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
The 2GW tender, supported by Viability Gap Funding (VGF), will be released on 25 March. Credit: DNV-GL

Solar Energy Corporation of India (SECI) has said that another 2GW tender for solar to be procured by Central Public Sector Undertakings (CPSUs) will be made available this month.

The CPSU scheme mandates cells and modules to be sourced locally and as per a note released today by the Ministry of New and Renewable Energy (MNRE), the government will be keeping a close eye on early tenders with a view to possibly including ingots, wafers and polysilicon to the domestic content mandate in future CPSU tenders.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The 2GW tender, supported by Viability Gap Funding (VGF), will be released on 25 March.

Back in February, SECI also announced plans for a 1GW CPSU solar tender

The latest issuance comes amid an unprecedented tendering spree across India.

The inaugural PV IndiaTech conference kicks off in New Delhi on 24-25 April.

Read Next

November 19, 2025
PVV Infra has outlined plans to build a 1GW TOPCon solar cell production line in the Indian state of Andhra Pradesh.
November 18, 2025
Tata Power Renewable Energy has commissioned a 300MW solar PV project for Indian hydropower company NHPC in Rajasthan. 
November 17, 2025
Jakson Group has started Phase 1 construction of its 6GW integrated solar ingot, wafer, cell and module manufacturing facility at Maksi, Madhya Pradesh.
November 17, 2025
India’s race to 500GW is being slowed by critical grid bottlenecks, NTPC PMI’s Abhinav Jindal told PV Tech.
November 17, 2025
Saatvik Green Energy, through its subsidiary Saatvik Solar Industries, has secured solar PV module orders worth INR1.77 billion (US$19.9 million). 
Premium
November 17, 2025
PV Talk: India’s race to 500GW of clean energy is being slowed by critical bottlenecks. NTPC PMI’s deputy general manager Abhinav Jindal tells Shreeyashi Ojha what steps India must urgently take to stay on track with its 2030 targets.

Upcoming Events

Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal
Solar Media Events
June 16, 2026
Napa, USA