SECI tenders 3MW of solar linked with battery storage in Ladakh

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: Solar Media

The Solar Energy Corporation of India (SECI) has issued a tender for two 1.5MW(AC) solar power projects with battery energy storage systems of 0.75MW / 2.5MWh each at two locations in the Indian state of Jammu and Kashmir.

The tender, which has been issued on behalf of construction agency Military Engineer Services (MES), is for design, engineering, supply, construction, installation, testing, and commissioning of the two projects at Tangtse and Durbuk in Leh district (Ladakh). It also includes 10 years of operations and maintenance (O&M) services.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

MES provides rear line engineering support to the Armed Forces. The Indian army is prominent in Ladakh due to the mountain region's proximity with the Chinese and Pakistan borders. Temperature at the project locations range from -30°C to 30°C and altitude is around 3,000 metres.

The battery storage system will be interconnected with the local distribution network and designed for maximum flexibility with regard to voltages, frequency, phase imbalance and protection requirements, according to the tender document.

The whole capacity of the tender will be awarded to a single contractor and the deadline for bid submissions is 23 August 2018.

India recently moved a step closer to having its first lithium-ion cell manufacturing facility with an agreement between local firm Raasi Group and two research institutions. Meanwhile, any kind of energy storage technology will be permitted in hybrid wind and solar projects under the government's recently released new hybrid policy.

William Brent, director of energy access coalition Power For All also recently guest blogged on how agro-centric mini-grids and solar trolleys could transform Indian farming.

Read Next

July 11, 2025
Indian independent power producer (IPP) Juniper Green Energy has commissioned an additional 71MWp at Chapalgaon Solar Project in Solapur, Maharashtra.
July 9, 2025
Indian solar water pump and motor manufacturer Shakti Pumps has successfully raised INR2.9 billion (US$34.1 million) to build a solar cell and module manufacturing plant.
July 8, 2025
German solar glass manufacturer Glasmanufaktur Brandenburg (GMB) has filed for insolvency after posting monthly losses of €900,000 this year.
July 8, 2025
Energy consultancy JMK Research has forecast 28.3GW of utility-scale and residential solar PV to be installed in India during fiscal year 2026.
July 8, 2025
SJVN Green Energy has commenced commercial operations of 100.02MW from its 1,000MW solar power project in Bikaner, Rajasthan.
July 7, 2025
ReNew has received a non-binding final acquisition offer from a consortium at US$8 per share, which is 13.2% more than their earlier offer.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 22, 2025
Bilbao, Spain
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK