SOLARWATT passes LeTID IEC test by VDE Renewables

June 4, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
SOLARWATT has successfully met the IEC CD 61215-1: Ed.2.0 test for Light and elevated Temperature Induced Degradation (LeTID) for its Vision 60M series PV panels, undertaken by testing and certification house, VDE Renewables. Image: SOLARWATT

Germany-based PV module manufacturer SOLARWATT has successfully met the IEC CD 61215-1: Ed.2.0 test for Light and elevated Temperature Induced Degradation (LeTID) for its Vision 60M series PV panels, undertaken by testing and certification house, VDE Renewables.

The IEC CD 61215-1: Ed.2.0 LeTID test includes two temperature cycles of 162 hours each with an applied current to simulate the LeTID phenomenon that can impact PERC (Passivated Emitter Rear Cell) based panels, which causes power degradation. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Under the IEC test, a pass criterion is awarded should the tested panel performance degrade less than 5% after the two cycles. In VDE Renewables' testing of SOLARWATT’s Vision 60M series product, degradation was certified to have been only 1.81%.

Norbert Betzl, director of product management solar panels at SOLARWATT said that “We strive for the best possible assurance of the performance of our solar modules, the predicted efficiency should be maintained in practice. It is essential for us to rule out a deterioration due to the LeTID effect as far as possible.”

Read Next

April 14, 2026
India’s MNRE has expanded the ALMM List-II for solar cells to 27.8GW, and added HJT cells for the first time.
April 14, 2026
Fraunhofer ISE has launched a new consultancy spin-off—NEXUS GreenTech—to support companies active in the solar PV industry.
April 14, 2026
Premier Energies is set to supply 1.6GW of solar cells and modules in the fourth quarter of 2026, under contracts valued at INR25.77 billion (US$276 million). 
April 13, 2026
Indian solar manufacturer Vikram Solar has surpassed 10GW in cumulative solar module deployments globally.
April 9, 2026
Dutch-based solar developer Novar has acquired a 100MW solar PV plant in Baden-Württemberg, a southern state in Germany.
April 8, 2026
PV manufacturing capital expenditure is expected to rebound this year, following two years in the doldrums as the industry weathered a global oversupply of modules, new figures show.

Upcoming Events

Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland