In its analysis, Ember examined grid capacity across 20 EU countries and found the major gap was at the transmission level, with a possible shortfall of 104 GW that would affect utility-scale solar projects.
Karnataka, Delhi, and Andhra Pradesh top decarbonisation, power ecosystem readiness, and market enablers, respectively, according to a joint report by IEEFA and Ember.
India’s power system faced growing integration challenges in 2025 as solar curtailment emerged as an early signal of insufficient grid flexibility, according to a new report from energy think tank Ember.