PV project developer and EPC firm, juwi Renewable Energy has started construction of its third PV power plant project in Vitenam, bringing its active pipeline to around 130MW.
Leading ‘Silicon Module Super League’ (SMSL) member JinkoSolar has acknowledged its recognition as a ‘Top Performer’ in DNV GL's 2018 PV Module Reliability Scorecard results, which were announced at SNEC in China in May.
A new technical report carried out by Energy and Environmental Economics, Inc. (E3) and sponsored by leading CdTe thin-film manufacturer First Solar, attempts to dispel the assumption that high levels of solar and wind electricity on electricity grids cause grid instability.
Leading CdTe thin-film module manufacturer First Solar is building a 58MW (AC) PV power plant using its next-generation large-area Series 6 modules and single-axis trackers for Facebook’s Prineville Data Center located in Oregon.
‘Silicon Module Super League’ (SMSL) leader JinkoSolar said it had supplied 10MW of its P-type mono PERC ‘Eagle’ modules (JKM295M-60) series for a PV power plant project built by Huaneng Renewables in Inner Mongolia, China.
Ahead of the forthcoming PV ModuleTech 2018 event in Penang, Malaysia on 23-24 October 2018, PV-Tech took the time to catch up with Pepijn Veling of Eternal Sun Group.